Figure 1-1. Rack Kit Contents
1
6
1
cable-management arm
4
slide assemblies

Installation Tasks

Installing a rack kit involves performing the following tasks (described in detail in subsequent sections)
in their numbered order:
1 Removing the rack doors
2 Marking the rack
3 Configuring the sliding rail assemblies
4 Installing the mounting rails in the rack
RapidRails installation
VersaRails installation
5 Installing the system in the rack
6 Installing the cable-management arm
7 Routing cables
8 Attaching the cable-management arm ramp assembly
9 Replacing the rack doors
8
Rack Installation Guide
3
2
2
left cable-management arm
ramp assembly
5
10-32 x 0.5-inch flange-head
Phillips screws (8)
4
5
3
right cable-management arm
ramp assembly
6
status indicator cable
(if applicable)