Asko TDC Operating Instructions Manual page 26

User manual 8089884 asko professional tdc111v en
Hide thumbs Also See for TDC:
Table of Contents

Advertisement

Installation instructions
6
5. Remove ground wire (green with yellow
stripes) from external ground connector screw
and remove from center terminal block.
6. Connect ground (green) wire of cord to external
ground conductor screw.
7. Connect neutral (white) wire of cord under
center screw of terminal block.
8. Connect the other wires to outer screws.
9. Tighten the strain relief screws.
10. Replace terminal box cover on back of dryer.
11. Plug dryer into wall receptacle.
12. Turn power on at breaker/fuse box.
Coin operation
The machine is prepared for coin operation. Such
installation must be carried out by a qualified
professional.
The installation requires a connection cable to
power the coin meter. This connection cable can
be ordered using spare part number 92 090 95.
The coin meter shall be able to short circuit two
signal lines for periods of up to 10 minutes. This
is to give the user time to load the machine,
choose a program, and start the program after
putting the coins in.
"Insert coin" appears on the display when the
machine is started with the main power switch.
26
4
7
8
Customer Care Center
1-800-898-1879
www.askousa.com

Advertisement

Table of Contents
loading

Table of Contents