Connecting The Power Cords; Powering-On The Dsn-2100 Storage System - D-Link DSN-2100-10 - xStack Storage Area Network Array Hard Drive Hardware Reference Manual

Iscsi san array
Hide thumbs Also See for DSN-2100-10 - xStack Storage Area Network Array Hard Drive:
Table of Contents

Advertisement

3.6

Connecting the Power Cords

The DSN-2100 storage system has a two power receptacles. Both must be used to connect
the DSN-2100 to an AC outlet:
1. Plug the female end of the power cord into the 3-pronged power connectors on the back
of the DSN-2100 storage system. Plug the other end of the power cord into a working AC
outlet that is not controlled by a wall switch.
2. Repeat the previous step using the second power cable and power receptacle on the
DSN-2100 storage system. For best results, all both power receptacles should be on a
different circuit.
3.7

Powering-on the DSN-2100 Storage System

To power-on the DSN-2100 storage system, press the power switch on the back panel. When
the DSN-2100 storage system powers-on, the following actions occur:
The DSN-2100 storage system Power LED turns green (see Figure 2-1).
The DSN-2100 storage system runs its power-on procedure (~4 minutes), then the
Ready/Fault LED turns green and drive LEDs may flash.
The completion of the power-on process can be verified as indicated in Table 3-2.
Table 3-2. Verifying Completion of the DSN-2100 Storage System Power-on Process
If the DSN-2100 Storage System...
Has no front panel Ready/Fault LED
Has a front panel Ready/Fault LED.
Diagnostic port is connected to a PC via a diagnostic cable.
After the DSN-2100 storage system powers-on for the first time, it automatically loads the
factory-default configuration settings. If necessary, you can use the xStack Storage
Management Center to change these settings to suit your requirements. For a description of
the array's factory-default configuration settings and how to change them, refer to the
xStack Storage Management Center User's Guide.
22
Chapter 3 Installing the DSN-2100 Storage System
Although the DSN-2100 storage system can operate temporarily with only
two AC power connections, an audio alarm will sound until both power
receptacles are used.
Verify the Power-on Process by...
Wait five minutes after powering-on the DSN-2100 storage
system.
The LED turns green when the startup process completes. If
the LED turns red, reboot the DSN-2100 storage system. If the
problem persists, contact Technical Support.
The message RCP sequence complete appears on the PC
monitor. After verifying this message, disconnect the PC from
the diagnostic port.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dsn-2100 xstack storage

Table of Contents