On the Schedule settings tab you can first check/uncheck the Enable this task item
to simply deactivate the scheduled program update temporarily, and switch it on again
as the need arises.
In the text field called Name (deactivated for all default schedules) there is the name
assigned to this very schedule by the program vendor. For newly added schedules (
you can add a new schedule by mouse right-click over the Program update
schedule item in the left navigation tree) you can specify your own name, and in that
case the text field will be open for editing. Try to always use brief, descriptive and apt
names for your schedules to make it easier to later recognize them.
Schedule running
Here, specify the time intervals for the newly scheduled program update launch. The
timing can either be defined by the repeated update launch after a certain period of
time (Run every ...) or by defining an exact date and time (Run at specific time ...),
or possibly by defining an event that the update launch should be associated with (
Action based on computer startup).
Advanced schedule options
This section allows you to define under which conditions the program update should/
should not be launched if the computer is in low power mode or switched off
completely.
Other update settings
Check the Run the update again after as the internet connection is available
option to make sure than if the internet connection gets corrupted and the update
process fails, it will be launched again immediately after the internet connection is
restored.
Once the scheduled update is launched in the time you have specified, you will be
informed on this fact via a pop-up window opened over the
AVG system tray icon
(
provided that you have kept the default configuration of the the
Advanced Settings/
Appearance
dialog).
A V G 9 .0 File Server © 2 0 1 0 C opyright A V G T ec hnologies C Z, s .r.o. A ll rights res erved.
6 9
Need help?
Do you have a question about the FILE SERVER 9.0 - REV 90.9 and is the answer not in the manual?
Questions and answers