Connecting The Cords - Brother BAS-300G Basic Operation Manual

Direct drive programmable electronic pattern sewer
Hide thumbs Also See for BAS-300G:
Table of Contents

Advertisement

3. INSTALLATION

3-9. Connecting the cords

<Main PCB>
NOTE:
• Check that the connector is facing the correct
way, and then insert it firmly until it locks into
place.
• Secure the cables with cable ties and cord
clamps, while being careful not to pull on the
connector.
*
1
: Be sure to make the ground connection.
(Refer to "3-10. Connecting the ground
wire".)
1842B
12
Connector
X pulse motor encoder 5-pin white
Y pulse motor encoder 5-pin blue
Work clamp pulse motor encoder 5-pin black
Foot switch 10-pin
Operation panel 8-pin
Machine head switch 3-pin
Home position sensor assembly 12-pin
STOP switch 6-pin
Valve harness 12-pin (pneumatic work clamp
specifications)
Programmer relay harness 8-pin
Solenoid selection harness 4-pin
BAS-300G, BAS-311G, BAS-326G
1. Gently tilt back the machine head.
2. Pass the cord bundle through the hole
in the work table.
3. Loosen the two screws (1), and then
open the cord presser plate (2) in the
direction of the right arrow and pass
the cord bundle through the opening.
4. Securely connect the connectors as
indicated in the table below.
NOTE:
• Check that the connector is facing
the correct way, and then insert it
firmly until it locks into place.
• Secure the cables with cable ties
and cord clamps, while being careful
not to pull on the connector.
4924Q
Connection location on
main PCB
P20 (X-ENC)
P4 (Y-ENC)
P5 (P-ENC)
P6 (FOOT)
P1 (PANEL)
P9 (HEAD-SW)
P8 (SENSOR1)
P13 (HEAD)
P12 (AIR1)
P7 (PRG)
P3(CUTTER)
(Continued on next page)
Lock the cord
clamp securely.
Cord clamp
(3)
(3)
(3)
(3)
(3)
(4)
(4)
(4)
(4)
(3)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bas-311gBas-326g

Table of Contents