Marking The Rack; Figure 1-5. Two-Post Open-Frame Relay Rack 1-U Hole Spacing - Dell PowerApp 110 Installation Manual

Rack installation guide
Table of Contents

Advertisement

support.dell.com

Marking the Rack

1.
Determine where you want to place the bottom of the PowerApp appliance.
CAUTION: If you are installing more than one PowerApp appliance, install
the first appliance in the lowest available position in the rack.
2.
Place the 1-U template over the front of the two-posts of the rack in the desired
location.
3.
Position the bottom of the template in line with the desired bottom position of
the computer chassis.
4.
Mark the upper and lower-mounting positions on the vertical rails as shown by
the V-notches on the sides of the template.
Each 1-U (1.75-inch) vertical space has three holes, with center-to-center spacing
between holes (beginning at the center of the top hole of a 1-U space) of 0.625,
0.625, and 0.5 inch (see Figure 1-5).
1.75 inches (1 U)

Figure 1-5. Two-Post Open-Frame Relay Rack 1-U Hole Spacing

0.5 inch
0.625 inch
0.625 inch
0.5 inch
Rack Installation Guide
1-7

Advertisement

Table of Contents
loading

Table of Contents