Installation - NETGEAR GSM7328FS - ProSafe Switch - Stackable Hardware Installation Manual

Managed stackable layer 3 switch
Hide thumbs Also See for GSM7328FS - ProSafe Switch - Stackable:
Table of Contents

Advertisement

Managed Stackable Layer 3 Switches GSM7328S and GSM7352S Hardware Installation Guide
4. Make sure that all items are present. See "Package Contents" on page 3-1.
5. Inspect the products and accessories for damage. Report any damage
immediately.

Installation

Install the equipment in the sequence presented in this chapter, as shown below:
1. Select a Location.
See "Select a Location" on page 3-4.
2. Install the Switch.
See "Install the Switch" on page 3-5.
3. Check the installation.
See "Check the Installation" on page 3-6
4. Apply power and check the LEDs.
See "Connect to Power and Check the LEDs" on page 3-6.
Hardware Installation
Note: If any item is found missing or damaged, contact your local
NETGEAR reseller for replacement.
v1.0, March 2006
3-3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GSM7328FS - ProSafe Switch - Stackable and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Gsm7328sGsm7352s

Table of Contents