Berner Architectural Elite 10 Installation & Maintenance Instructions Manual

Advertisement

Quick Links

www.Berner.com
WHEN THE DOORS ARE OPEN
Indoor Only
Installation & Maintenance Instructions

TABLE OF CONTENTS

I. UNCRATING............................................................................................................................................................ ........................................................ 2
II. GENERAL MOUNTING INSTRUCTIONS ................................................................................................................................. ................................... 4
III. WALL MOUNTING ...................................................................................................................................................................................................... 4
IV. SUSPENDED MOUNTING ....................................................................................................................................... ................................................... 5
V. ELECTRICAL CONNECTIONS ..................................................................................................................................................................................... 5
VI. FIELD CONNECTIONS ................................................................................................................................................................................................ 6
VII. OPERATING INSTRUCTIONS (Berner AIR™, Intelliswitch™, BACnet / Modbus) .............................................................................................. 7
INTELLISWITCH™ QUICK START OPERATION .................................................................................................................................................... 12
VIII. MAINTENANCE AND CLEANING ............................................................................................................................................................................ 8
IX. SERVICE ............................................................................................................................................................... ........................................................ 9
X. TROUBLESHOOTING ................................................................................................................................................................................................. 14
A. INTERCONNECT OPERATION (daisy chain) .................................................................................................................................................. 15
B. REMOTE MOUNTED TOUCHSCREEN or TABLET............................................................................................................................................15
C. BUILDING MANAGEMENT SYSTEM (BMS) INTEGRATION (BACnet or Modbus) ................................................................................. 15
XII.WARRANTY ................................................................................................................................................ ............................................................... 16
Berner International has been saving energy and creating healthy, comfortable environments for our customers
for over 60 years. Berner offers unmatched quality, performance, and dependability-not to mention our service.
READ ALL INSTRUCTIONS BEFORE INSTALLING OR USING AIR CURTAIN
IMPORTANT INSTRUCTIONS
®
save energy & create healthy, comfortable environments
Thank you for choosing Berner.
At Berner, we stand behind our products.
Architectural Elite 8 & 10
Air Curtain Series
#AE08 & AE10
Connect with
BERNER AIR
SET UP
CONTROL
TROUBLESHOOT
©Copyright, 2024 Berner International
BERNER.COM
II-220E
December, 2024

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Architectural Elite 10 and is the answer not in the manual?

Questions and answers

Summarization of Contents

III. WALL MOUNTING
A. PREPARATION
Steps for preparing wall mounting, including clearances and structure verification.
B. MOUNTING WALL BRACKETS
Instructions for positioning and securing wall mounting brackets to the supporting structure.
C. ATTACHING THE AIR CURTAIN TO THE WALL MOUNTING BRACKETS
Procedure for raising and interlocking the air curtain unit with the mounted brackets.
IV. SUSPENDED MOUNTING
A. PREPARATION
Steps for preparing suspended mounting, including locating threaded inserts.
B. SUSPENSION ROD INSTALLATION
Installing suspension rods or suitable hardware to the unit's threaded inserts.
VI. FIELD CONNECTIONS
A. ELECTRICALLY HEATED MODELS
Field connections specific to electrically heated models, including controls and wiring.
VII. OPERATING INSTRUCTIONS
A. GENERAL OPERATION
Basic operation using the built-in Intelliswitch or the Berner AIR app.
B. HOT WATER HEATED MODELS
Specific operating instructions for hot water heated units.
VIII. MAINTENANCE & CLEANING
A. PERFORMING PREVENTIVE MAINTENANCE
Steps for performing routine preventive maintenance, including filter cleaning and internal checks.
IX. SERVICE
A. REPLACING FANS AND/OR MOTORS
Instructions for replacing fans and motors in the unit, with specific steps for AE08 and AE10 models.
XI. APPENDIX
A. INTERCONNECT CONNECTION (a.k.a. daisy chain) VIA PHYSICAL CONNECTION
Connecting multiple air curtains for programming from a single controller.
B. REMOTE MOUNTED TOUCHSCREEN DISPLAY OR TABLET
Connecting external displays or tablets to the unit for control and monitoring.
C. BUILDING MANAGEMENT SYSTEM (BMS) INTEGRATION (BACnet or Modbus)
Integrating the unit with BMS using BACnet or Modbus protocols.

Table of Contents