Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
WEG Manuals
Engine
MAR
Installation, operation and maintenance manual
WEG MAR Installation, Operation And Maintenance Manual
Low and high voltage three phase induction motors, m line slip ring rotor vertical liftable 2016
Hide thumbs
1
2
3
4
5
6
Table Of Contents
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
page
of
71
Go
/
71
Contents
Table of Contents
Bookmarks
Table of Contents
Dear Customer
Table of Contents
Introduction
Safety Warnings in the Manual
General Instructions
Qualified Personnel
Safety Instructions
Standards
Environmental Conditions
Operating Conditions
Voltage and Frequency
Receiving, Handling and Storage
Receiving
Handling
Motor Positioning
Storage
Outdoor Storage
Extended Storage
Storage Location
Indoor Storage
Outdoor Storage
Separate Parts
Preservation During the Storage
Space Heater
Insulation Resistance
Exposed Machined Surfaces
Sealing
Bearings
Grease-Lubricated Rolling Bearing
Oil-Lubricated Rolling Bearing
Sleeve Bearing
Brushes
Terminal Boxes
Air-Water Heat Exchanger
Cleanliness and Conservation of the Motor During Storage
Inspections and Records During Storage
Predictive / Preventive Maintenance
Maintenance Plan During Storage
Preparation for Commissioning
Cleaning
Bearing Inspection
Bearing Lubrication
Brushes, Brush Holders and Slip Rings
Insulation Resistance Verification
Air-Water Heat Exchanger
Others
Installation
Installation Site
Shaft Lock
Axial Lock
Radial Lock
Procedure for Replacing the Radial Locking Device
Rotation Direction
Insulation Resistance
Safety Instructions
General Considerations
Measurement on the Stator Windings
Measurement on the Rotor Winding
Conversion of the Measured Values
Polarization Index
Recommended Minimum Values
Protections
Thermal Protections
Temperature Limits for the Windings
Alarm and Trip Temperatures
Temperature and Ohmic Resistance of the PT100 Thermoresistance
Space Heater
Water Leak Sensor
Cooling
Air-Water Heat Exchange Cooling
Radiators for Application with Seawater
Independent Ventilation Cooling
Electrical Aspects
Electrical Connections
Main Electrical Connections
Grounding
Connection Diagrams
Connection Diagrams According to IEC60034-8
Stator Connection Diagrams
Rotor Connection Diagrams
Connection Diagrams According to NEMA MG1
Stator Connection Diagrams
Rotor Connection Diagrams
Rotation Direction
Accessory Connection Diagrams
Motorized Brush Holder Connection Diagram
Condition for Starting with Lowered Brushes and Non-Short-Circuited Slip Rings
Condition for Operation with Lifted Brushes and Short-Circuited Slip Rings
Motorized Brush Holder Operation Logic
Manual Operation
Wiring Diagram of Motorized Brush Holder Control System
Mechanical Aspects
Base
Base Loads
Motor Mounting
Motor with Solid Shaft and Flange
Motor with Hollow Shaft and Flange
Anchor Plate Set
Natural Frequency of the Base
Leveling
Alignment
Hollow Shaft Motor Alignment
Doweling
Couplings
Direct Coupling
Gear Coupling
Belt Drive
Coupling for Hollow Shaft Motors
Hydraulic Unit
Liftable Brush Holder System
System Controller
Control System Automation Logic
Motor Starting Logic Interlock
Motor Operation Logic Interlock
System Fault Indicators
Liftable Brush Holder Operation Modes
Remote Motorized Mode
Local Motorized Mode
Manual Mode
Starting
Starting with Rheostat
Starting of Motors with Motorized Brush Holder
Conditions for Motor Starting
After Starting
Manual Operation
Commissioning
Preliminary Inspection
Commissioning of the Brushes Lifting System
Initial Checks
Manual Mode Activation
Local Motorized Mode Activation
Remote Motorized Mode Activation
Commissioning of the Control System Connected to the User System
Initial Checks
Motor Starting Simulation
Motor Shutdown Simulation
Characteristics of the Liftable Brush Holder Control System
Timers Setting
Operation
General
Load Condition
Temperatures
Bearings
High-Pressure Oil Injection System
Radiators
Vibration
Shaft Vibration Limits
Shutdown
Motor Starting and Shutdown
Preparation for Motor Starting
Motor Starting
Motor Shutdown
Maintenance
General
Brushes and Slip Rings
General Cleaning
Brushes Compartment Cleaning
Winding Maintenance
Winding Inspection
Winding Cleaning
Inspections
Reimpregnation
Insulation Resistance
Cooling System Maintenance
Radiator Maintenance
Vibration
Anti-Reversion Ratchet Maintenance
Slip Rings
Brush Holder and Brushes
Adjustment of the Brushes to the Load Conditions
Shaft Grounding Device
Bearing Maintenance
Grease-Lubricated Rolling Bearings
Instructions for Lubrication
Procedures for Rolling Bearing Relubrication
Rolling Bearing Relubrication with Drawer Device for Grease Removal
Type and Amount of Grease
Alternative Greases
Procedure for Changing the Grease
Low Temperature Greases
Grease Compatibility
Disassembly - Vertical Bearings
Before Disassembling
Lower Bearing Disassembly
Upper Bearing Disassembly
Bearing Assembly
Oil-Lubricated Rolling Bearing
Lubrication Instructions
Oil Type
Oil Change
Bearing Operation
Bearing Disassembly
Bearing Assembly
Rolling Bearing Replacement
Sleeve Bearings
Bearing Data
Bearing Installation and Operation
Cooling by Water Circulation
Oil Change
Sealing
Sleeve Bearing Operation
Sleeve Bearing Maintenance
Bearing Disassembly and Assembly
Thrust Bearing (Upper)
Guide Bearing (Lower)
Bearing Protection
Protection Settings
Disassembly/Assembly of the Sleeve Bearing Temperature Sensors
Maintenance of the Brush Lifting System
Preventive Maintenance Procedures
Inductive Sensors of the Liftable Brush Holder
Slip Rings Short-Circuit Contacts
Fixing the Drive Arm of the Short-Circuit Bushing
Gear Motor Maintenance
Motor Disassembly and Assembly
Parts List
Disassembly
Assembly
Air-Gap Measurement
Tightening Torque
Spare Parts
Maintenance Plan
Abnormalities, Causes and Solutions
Declaration of Conformity
Environmental Information
Package
Product
Hazardous Waste
Service Network
Warranty Term
Advertisement
Quick Links
Download this manual
Low and high voltage three phase
induction motors
M line - Slip ring rotor
Vertical Liftable 2016
Installation, Operation and Maintenance Manual
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the MAR and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for WEG MAR
Engine WEG MRX65-130 Assembly Instructions
Oor coupling rotary handle (nema 4x/ip65) (2 pages)
Engine WEG M line Series Installation, Operation And Maintenance Manual
Low and high voltage three phase induction motors (59 pages)
Engine WEG MAA Installation, Operation And Maintenance Manual
Low and high voltage three phase induction motors, m line slip ring rotor vertical liftable 2016 (71 pages)
Engine WEG MAP Installation, Operation And Maintenance Manual
Low and high voltage three phase induction motors, m line slip ring rotor vertical liftable 2016 (71 pages)
Engine WEG MAT Installation, Operation And Maintenance Manual
Low and high voltage three phase induction motors, m line slip ring rotor vertical liftable 2016 (71 pages)
Engine WEG MAF Installation, Operation And Maintenance Manual
Low and high voltage three phase induction motors (59 pages)
Engine WEG M4 Manual For Installation, Operation And Maintenance
Low voltage eletric motors (2 pages)
Engine WEG W22Xd Instructions Manual For Installation, Operation And Maintenance
Electric motors for explosive atmospheres. w21 series; w22x series; w50x series; hgf series; ex61g series (40 pages)
Engine WEG W22Xdb Installation, Operation And Maintenance Manual
Flameproof motors (68 pages)
Engine WEG W22 Premium Installation, Operation And Maintenance Manual
(111 pages)
Engine WEG WGM Installation, Operation And Maintanance Manual
Three phase induction motors cooled by water jacket (55 pages)
Engine WEG W21 Instruction Manual
Electric motors for explosive atmospheres (7 pages)
Engine WEG W21 Instructions Manual For Installation, Operation And Maintenance
W22x series; w50x series. electric motors for explosive atmospheres (2 pages)
Engine WEG GPW Series Installation, Operation And Maintenance Manual
Synchronous alternators (39 pages)
Engine WEG WG20 Mounting Instruction
Geared motors (44 pages)
Engine WEG W22Xdb C 315 Instruction Manual
Hazardous area motors (65 pages)
Summarization of Contents
Introduction
Safety Warnings in the Manual
Explains the meaning of DANGER, ATTENTION, and NOTE warnings.
General Instructions
Qualified Personnel
Defines who is qualified to perform tasks on the motor.
General Safety Instructions
Outlines general safety precautions for motor operation and handling.
Applicable Standards
Lists applicable IEC/NBR and NEMA standards for motor design.
Operating Conditions
Details general conditions for motor operation and warranty validity.
Voltage and Frequency Limits
Specifies acceptable voltage and frequency variation limits for motor operation.
Receiving, Handling and Storage
Receiving Procedures
Procedures for inspecting motors upon receipt for damage.
Handling Guidelines
Guidelines for safely lifting and moving vertical motors.
Motor Positioning
Instructions for moving motors from horizontal to vertical position.
Storage Requirements
Requirements for storing motors to maintain condition and warranty.
Extended Storage Guidelines
Specifics for motors stored for two months or more.
Storage Location Requirements
Criteria for ideal indoor and outdoor storage locations.
Preservation Methods During Storage
Methods to preserve motor components during storage.
Bearing Preservation During Storage
Procedures for preserving grease and oil-lubricated bearings.
Preparation for Commissioning
Steps to prepare the motor for initial operation after storage.
Pre-Commissioning Cleaning
Cleaning steps required before initial motor operation.
Pre-Commissioning Insulation Resistance Verification
Verifying insulation resistance before commissioning the motor.
Installation
Installation Site Requirements
Requirements for selecting an accessible and well-ventilated installation location.
Shaft Locking Device
Information on removing and refitting shaft locking devices for transport.
Rotation Direction Identification
How to identify and check the motor's rotation direction.
Insulation Resistance Measurement
Procedures and standards for measuring insulation resistance.
Minimum Insulation Resistance Values
Specifies minimum acceptable insulation resistance and PI values.
Motor Protection Systems
Details on motor protection devices and settings.
Thermal Protection Settings
Information on over-temperature protection sensors and limits.
Cooling System Overview
Overview of motor cooling systems and requirements.
Air-Water Heat Exchange Cooling
Details on air-water heat exchangers and coolant specifications.
Electrical Connection Guidelines
Guidelines for main electrical connections and grounding.
Motor Connection Diagrams
Provides stator and rotor connection diagrams for IEC and NEMA standards.
Motorized Brush Holder Wiring Diagram
Wiring diagram for the motorized brush lifting system.
Brush Holder System Operation Logic
Explains the logic for brush lifting and lowering operations.
Mechanical Aspects Overview
Physical mounting and alignment considerations.
Motor Mounting Procedures
Instructions for mounting motors with solid or hollow shafts.
Shaft Alignment Procedures
Procedures for aligning the motor with the driven machine.
Coupling Selection and Installation
Guidance on selecting and installing couplings for torque transmission.
Liftable Brush Holder System Operation
Detailed information on the operation and control of the brush lifting system.
Brush Holder Control System Logic
Logic interlocks for motor starting, operation, and shutdown.
Brush Holder Operation Modes
Describes remote, local, and manual operation modes.
Starting
Starting with Rheostat
Explanation of starting wound-rotor motors using an external rheostat.
Starting with Motorized Brush Holder
Procedure for starting motors with the motorized brush lifting system.
Motor Starting Prerequisites
Prerequisites and sequence for initiating motor start-up.
Commissioning
Preliminary Inspection Checklist
Checks to perform before the first motor start or after a standstill.
Brush Lifting System Commissioning
Steps for commissioning the brush lifting system.
Brush System Initial Checks
Preliminary checks before energizing the brush lifting control system.
Local Motorized Mode Activation
Steps to activate the local motorized operation mode.
Remote Motorized Mode Activation
Steps to activate the remote motorized operation mode.
Control System Integration Commissioning
Integrating the motor control system with the user's automation system.
Motor Start Simulation
Simulating motor start-up to test the control system.
Motor Starting and Shutdown
Preparation for Motor Starting
Steps to prepare the motor for its initial start.
Motor Starting Procedure
The complete procedure for starting the motor with the brush lifting system.
Motor Shutdown Procedure
Procedures for safely shutting down the motor.
Maintenance
General Maintenance Recommendations
General recommendations for an effective electric motor maintenance program.
Winding Maintenance Procedures
Procedures for inspecting and cleaning motor windings.
Winding Inspection
Annual visual inspection and insulation resistance checks of windings.
Insulation Resistance Measurement
Essential step to measure winding insulation resistance before operation.
Cooling System Maintenance
Maintaining air-air and air-water heat exchangers.
Brush Holder and Brushes Maintenance
Maintenance of brush holders and brushes, including wear checks.
Brush Adjustment for Load Conditions
Adjusting brushes based on actual motor load conditions.
Bearing Maintenance Procedures
Comprehensive guide to bearing maintenance.
Grease-Lubricated Bearing Maintenance
Procedures for lubricating and relubricating grease-lubricated bearings.
Rolling Bearing Relubrication
Step-by-step guide for relubricating rolling bearings.
Grease Type and Quantity
Specifies correct grease types, quantities, and speed limits.
Oil-Lubricated Bearing Maintenance
Guidelines for oil-lubricated bearing maintenance and oil changes.
Oil-Lubricated Bearing Oil Change
Intervals for changing oil based on bearing operating temperature.
Sleeve Bearing Maintenance
Maintenance procedures for sleeve bearings.
Sleeve Bearing Oil Change
Procedures for changing oil in sleeve bearings.
Brush Lifting System Maintenance
Preventive maintenance procedures for the entire brush lifting system.
Brush System Preventive Maintenance
Daily, monthly, and semiannual maintenance tasks.
Motor Disassembly and Assembly
Motor Disassembly Procedure
Steps and precautions for disassembling the electric motor.
Motor Reassembly Procedure
Procedures for reassembling the motor after disassembly.
Air-Gap Measurement
How to measure the air gap for concentricity after assembly.
Screw Tightening Torque
Recommended tightening torques for metal/metal and metal/isolated parts.
Motor Maintenance Schedule
Troubleshooting Motor Problems
EU Declaration of Conformity
Environmental Information
Motor Packaging Information
Details on the materials used for motor packaging and their disposal.
Product Material Information
General information about motor materials and their lifecycle.
Hazardous Waste Disposal
Guidance on the proper disposal of grease and oil waste.
WEG Service Network
Product Warranty Information
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the MAR and is the answer not in the manual?
Questions and answers