Run a plan/task
Stop a plan/task
94
Backup plan
Click
Run.
In the Run Backup Plan (p. 97) window, select the task you need to be run.
Running the backup plan starts the selected task of that plan immediately in
spite of its schedule and conditions.
Why can't I run the backup plan?
Do not have the appropriate privilege
Without the Administrator privileges on the machine, a user cannot run
plans owned by other users.
Task
Click
Run.
The task will be executed immediately in spite of its schedule and conditions.
Backup plan
Click
Stop.
Stopping the running backup plan stops all its tasks. Thus, all the task operations
will be aborted.
Task
Click
Stop.
What will happen if I stop the task?
Generally, stopping the task aborts its operation (backup, recovery, validation,
exporting, conversion, migration). The task enters the Stopping state first, then
becomes Idle. The task schedule, if created, remains valid. To complete the
operation you will have to run the task over again.
recovery task (from the disk backup): The target volume will be deleted and
its space unallocated – you will get the same result if the recovery is
unsuccessful. To recover the "lost" volume, you will have to run the task once
again.
recovery task (from the file backup): The aborted operation may cause
changes in the destination folder. Some files may be recovered, but some
not, depending on the moment when you stopped the task. To recover all the
files, you will have to run the task once again.
Copyright © Acronis, Inc., 2000-2010

Advertisement

Table of Contents
loading

This manual is also suitable for:

Backup & recovery 10 server for linux

Table of Contents