Download Print this page

Mohawk TR-19 Manual

25,000/19,000 lb. capacity four post truck lifts

Advertisement

Quick Links

TR-25A, FL-25,TR-19
25,000/19,000 LB. CAPACITY FOUR POST
Thank you for sending in your
warranty registration card.
- Mohawk Service Dept.
MOHAWK
MOHAWK INDUSTRIAL PARK
ROOMAN AVE. P.O. BOX 110
AMSTERDAM, NY 12010
TOLL FREE : 1-800-833-2006
LOCAL : 1-518-842-1431
FAX : 1-518-842-1289
INTERNET: WWW.MOHAWKLIFTS.COM
E-MAIL:
TECHSUPPORT@MOHAWKLIFTS.COM
FILE: FL25 TR25 TR19 SERIES 12-1-2015.doc
REVISION DATE: 12-1-2015
P/N: 601-800-358
MADE IN THE USA
MODEL
TRUCK LIFTS MANUAL
.
- INSTALLATION
- OPERATION
- MAINTENANCE
- PARTS
READ MANUAL
THOROUGHLY
BEFORE INSTALLING,
OPERATING OR
MAINTAINING LIFT !!

Advertisement

loading
Need help?

Need help?

Do you have a question about the TR-19 and is the answer not in the manual?

Questions and answers

Summarization of Contents

APPENDAGES AND SAFETY
Accessory Usage Warning
All accessories supplied with this lift must be used on this lift only. Other accessories are not acceptable.
Jacking Beam Load Limit Warning
Jacking beam load ratings must not exceed the lift's rated capacity to prevent injury or damage.
WARRANTY INFORMATION
General Warranty Details
Mohawk's warranty obligation is limited to repair/replacement of defective parts returned to the factory.
Component Warranties and Exceptions
Covers structural, mechanical, power, electrical, pneumatic, and hydraulic components by model and time frame.
TECHNICAL SPECIFICATIONS
Lift Model Specifications
Detailed specifications for TR-25A, FL-25, TR-19 models including capacity, dimensions, and weights.
Site and Floor Requirements
Guidelines for bay size, overhead clearance, and concrete floor specifications for installation.
PARTS LISTING
Packing List
Comprehensive list of all parts included in the TR-25A, FL-25, TR-19 lift package.
Parts Box Contents
Detailed inventory of components found within Parts Box #1.
INSTALLATION GUIDANCE
Pre-Installation Checks
Essential inspections before installing the lift, covering area, concrete, and power supply.
Installation Steps
Step-by-step instructions for assembling and setting up the lift unit.
Leveling Tracks
Procedures for adjusting tracks to ensure proper level lifting performance.
OPERATIONAL SAFETY AND PROCEDURES
Safety Tips
Crucial safety guidelines for lift operators to ensure safe vehicle lifting.
Pre-Operation Checklist and Lifting Procedures
Checklist before operation and detailed steps for lifting/lowering vehicles.
MAINTENANCE AND TROUBLESHOOTING
Maintenance Schedule
Routine maintenance tasks for daily, weekly, monthly, semi-annual, and annual checks.
Troubleshooting Common Issues
Solutions for common lift problems such as not raising, not lowering, or leaks.
WEJ-IT ANCHOR SYSTEM
Anchor Features and Specifications
Details on Wej-it anchor benefits, load capacities, and installation requirements.
Anchor Installation and Maintenance
Instructions for proper installation and periodic inspection of Wej-it anchors.
ASSEMBLY DIAGRAMS
Final Assembly Diagram
Exploded view illustrating the complete assembly of the TR-25A lift.
Hydraulic System Diagram
Diagram showing the layout and components of the lift's hydraulic system.
Chain Routing Diagram
Illustration detailing the correct routing of lift chains.
NEW SLAB RECOMMENDATIONS
Basic Concrete Requirements
Mandatory concrete strength, aging, and thickness requirements for new slab installations.
Recommended Slab Designs
Design specifications for new concrete slabs for 2-post and 4-post lifts.