Download Print this page
Lefroy Brooks WL 1220 Installation, Operating,  & Maintenance Instructions

Lefroy Brooks WL 1220 Installation, Operating, & Maintenance Instructions

White lever 3-hole basin mixer with pop-up waste

Advertisement

Quick Links

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS
CW-1050 (WL 1220)
WHITE LEVER 3-HOLE BASIN MIXER WITH POP-UP WASTE

Advertisement

loading
Need help?

Need help?

Do you have a question about the WL 1220 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Installation Procedure
Steps 1-4
Install the hot-side-body, cold-side-body, handle assemblies, spout, and connector.
Steps 5-8
Install lift rod, pop-up rod, pop-up assembly, and hose connections.
Steps 9-12
Take off aerator, turn on water, clear debris, re-assemble aerator, and finish.
Safety, Care, and Maintenance
Safety Tips
Guidance on safe installation practices and precautions to avoid damage.
Important Installation Points
Key considerations before and during faucet installation.
Care and Maintenance
Recommendations for keeping the faucet in good condition and routine checks.
Product Guarantee Information
Guarantee of Quality
Details on product warranty against faulty materials and workmanship.
Guarantee Period and Claims
Duration of warranty for private and commercial use, and claim process.
Exclusions from Guarantee
Conditions and damages not covered by the product warranty.