Advertisement

FRT:
EVO
WSB and WSG - Variants
1. Starting page
All rights reserved by FEIN, in particular as these apply to trademarks.
MVK 01/06
1/118
FEIN retains all powers of disposition such as copying and right of transfer.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EVO WSG 9-125 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Technical Data
Technical Specifications Overview
Detailed technical specifications for various models.
Maintenance
Regulations and Safety
Rules and standards for repair and maintenance.
Cleaning and Care
Instructions for regular cleaning and upkeep.
Carbon Brush Replacement
Step-by-step guide for replacing carbon brushes.
Scheduled Maintenance Tasks
Maintenance tasks based on operating hours.
Electrical Function Test
Minor Functional Test Procedures
Steps for performing a basic functional check.
Major Functional Test and Troubleshooting
Comprehensive functional tests and troubleshooting steps.
Electrical Test Data
Technical data and specifications for electrical tests.
Wiring Diagrams and Connection Plans
Schematics for electrical connections.
Safety and Final Inspection Tests
Procedures for safety and final inspection.
Disassembly Procedures
Preparation for Disassembly
Initial steps and tools required before disassembly.
Speed Control Disconnection
Steps to disconnect the speed control unit.
Speed Control Removal
Steps to remove the speed control unit.
Carbon Brush Holder Removal
Procedure for removing carbon brushes and holder.
Gear Assembly Disassembly
Steps to disassemble gear components.
Gearbox Case Disassembly
Procedure for taking apart the gearbox housing.
Protective Cover Disassembly
Steps to remove the protective cover.
Gear Plate Disassembly
Procedure for disassembling the gear plate.
Armature Disassembly
Steps for removing the armature.
Field Magnet Unit Disassembly (Pressure Plates)
Procedure for disassembling the field magnet unit and plates.
Field Magnet Unit and Switching Module Disassembly
Steps to disassemble the field magnet unit and switching module.
Assembly Procedures
Gearbox Case Assembly (Part 1)
First part of the gearbox case assembly process.
Gearbox Case Assembly (Part 2)
Second part of the gearbox case assembly process.
Gear Plate Assembly
Steps for assembling the gear plate.
Protective Plate Assembly
Procedure for assembling the protective plate.
New Armature Installation
Steps for installing a new armature.
Switching Module Assembly
Procedure for assembling the switching module.
Pressure Plates Assembly
Steps for assembling the pressure plates.
Armature Installation
Steps for installing the armature into the gearbox.
Carbon Brushes Assembly
Procedure for assembling the carbon brushes.
Cable Strand Placement (1)
First part of cable strand routing and connection.
Cable Strand Placement (2)
Second part of cable strand routing and connection.
Case Shells Assembly
Steps for assembling the motor casing shells.
Bearing Plate Assembly
Procedure for assembling the bearing plate.
Customer-Ready Assembly
Final steps to prepare the tool for delivery.
Tools for Maintenance Work
Standard Mechanical Tools
List of all standard mechanical tools required for maintenance.
Specialized Maintenance Tools
List and specifications of specialized tools for tasks.
Lubricant Recommendations
Types of grease and their applications for maintenance.
Adhesives and Sealants
Sealants and adhesives for assembly and repair.
Modifications and Extras
WSB Model Type Differences
Comparison of physical differences between WSB models.
Switching Module Differences
Comparison of switching module lengths for WSB models.
Speed Controller Information
Details on speed controller type plates and labels.
Switching Module Information
Details on switching module type plates and codes.
Production History and Feature Changes
Chronological overview of product modifications and features.

Table of Contents