Vogelsang VX Series Manual

Vogelsang VX Series Manual

Rotary lobe pumps
Table of Contents

Advertisement

WELCOME TO VOGELSANG FACTORY TRAINING
Best Practices for Installation of
VX Rotary Lobe Pumps

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VX Series and is the answer not in the manual?

Questions and answers

Summarization of Contents

Pump Storage
Storage Procedures
Detailed steps for short and long-term pump storage.
Recommissioning
Steps to prepare the pump for operation after storage.
Installation Preparation
Lockout & Tagout Safety
Critical safety procedure to prevent accidental startup.
Installation Hazard Awareness
Risks like over-pressurization and dry running.
Pump Handling and Moving
Moving Procedures
Lifting techniques for different pump assemblies.
Pump Installation
Flange Mounting and Grouting
Attaching flanges and optional grouting.
Coupling Alignment
Crucial for operational integrity and preventing wear.
Pressurized Oil Bottle System
System Overview and Operation
Function, components, location, and pressurizing.
Troubleshooting and Oil
Common issues and oil types.
Factory Data Card
Identification and configuration.
Startup and Operation
Startup Procedures
General startup, flow direction, and wiring.
Control Systems and Documentation
Panel setup, startup checklist, and identification.

Table of Contents

Save PDF