Monitoring Task Completion Status - HP X1600 - StorageWorks Network Storage System 5.4TB SAS Model NAS Server User Manual

Automated storage manager
Hide thumbs Also See for X1600 - StorageWorks Network Storage System 5.4TB SAS Model NAS Server:
Table of Contents

Advertisement

2.
Do one of the following:
• To go back and change your selections, click Back.
• To run the listed tasks immediately, click Finish.
• The Task Viewer opens, running the tasks required to configure storage and migrate data.
See
• To schedule tasks to run at a later time, select Schedule tasks to run later, enter a start date
and time, and then click Finish.
To select AM or PM for the start time, click the up and down arrow buttons.
To use a calendar to select a start date, click the down arrow button (located to the right of
the up and down arrow buttons) to open a calendar. To change the month displayed on the
calendar, click the previous and next buttons on the calendar, or click on the month or year
displayed at the top of the calendar to display drop-down lists.

Monitoring task completion status

The Task Viewer shows the status of ASM wizard tasks. ASM wizard tasks allocate and configure
storage, host application storage and shared folders, and configure data protection.
NOTE:
Click the Expand tree icon next to a task to view its subtasks.
Select a task to view its description in the Details box on the Task Viewer.
The Task Viewer has a filter drop-down menu. Each selection displays information about task-completion
status for different time periods:
Show All—Displays all tasks that have been completed or failed to complete. Displays the tasks
and subtasks currently being processed and all scheduled tasks.
Today—Displays the tasks and subtasks currently being processed, all scheduled tasks, and tasks
that completed or failed today.
Last 3 Days—Displays the tasks and subtasks currently being processed, all scheduled tasks, and
tasks that completed or failed during the past three days, including today.
Last 7 Days—Displays the tasks and subtasks currently being processed, all scheduled tasks, and
tasks that completed or failed during the past seven days, including today.
Last 30 Days—Displays the tasks and subtasks currently being processed, all scheduled tasks, and
tasks that completed or failed during the past thirty days, including today.
Errors Only—Displays all tasks that have failed and provides information about problems that
occurred during task processing.
The status of each task is provided and can be any one of the following:
Scheduled—The task has been scheduled to run at a specified time.
Verifying—ASM is confirming the configuration you specified is valid.
Ready—The task is ready to run and is waiting for other tasks or background processes to run.
Running—The task is being processed.
Completed (date)—The task completed without problems.
Cancelling—The task is being cancelled.
Cancelled—The task has been cancelled (see
Failed—An error occurred during processing.
Monitoring task completion status
HP StorageWorks X1000 Automated Storage Manager
for more information.
Cancelling
tasks).
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks x1000

Table of Contents