ESM-48100B1 V100R025C93 User Manual Issue Date 2024-12-05 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Page 3
This agreement is the end user license agreement between you (an individual, company, or any other entity) and Huawei for the use of the Huawei Software. Your use of the Huawei Software will be deemed as your acceptance of the terms mentioned in this agreement. For details about this agreement, visit the following web page: https://e.huawei.com/en/about/eula...
User Manual About This Document About This Document This document describes the lithium battery ESM-48100B1 (ESM for short) in terms of its overview, application scenarios, external ports, working principles, installation, and commissioning. The figures provided in this document are for reference only.
Page 29
If ESMs of different models need to be used together, contact technical support. ● If ESMs of different models need to be used in a Huawei power system, contact technical support. ● The intelligent antitheft functions are available only after corresponding licenses are activated.
When a third-party cabinet is used, it is recommended that 4 U space be reserved for each ESM. ESMs cannot be stacked and must be laid flat. When a Huawei cabinet is used, see the installation guide of the corresponding cabinet to determine the clearances.
When a third-party cabinet is used, it is recommended that 4 U space be reserved for each battery. Batteries cannot be stacked and must be laid flat. When a Huawei cabinet is used, see the installation guide of the cabinet to determine the clearances.
Page 57
NO TICE ● Comply with regulations and warnings issued by the ESM manufacturer. ● The ESM-48100B1 weighs about 46 kg and is 396 mm deep. ● Batteries can be installed in a 19-inch rack. The rack should have a load- bearing structure.
Figure 4-4 Installing a ground cable for the ESM (1) Ground bar ----End 4.3 Installing ESM Cables (Huawei Power System) If ESMs are connected to a Huawei power system, perform the following steps to install cables. NO TICE After installing power terminals, periodically check whether they are tightened, and whether rust, corrosion, or other foreign objects exist.
4.3.2 Installing ESM PWR Activation Cables NO TE ● To install activation cables for Huawei power systems (except 57 V power systems), perform the following steps. ● Connect an activation cable when the BLVD contactor is normally open (NO) and powered by batteries.
NO TICE If the Huawei power monitoring module is connected to the ESM for the first time, the monitoring module will restart automatically because the battery management parameters need to be switched to the ESM parameters.
User Manual 5 Power-On and Commissioning 5.4 iLock If ESMs are connected to a Huawei power system and the antitheft function needs to be activated, perform the following steps. NO TE ● Before NetEco replacement or SMU software R-version upgrade, deactivate the iLock of the ESM.
● The mobile phone can properly connect to the Internet. Procedure Step 1 Contact technical support to obtain the latest Site app installation package. Log in to the Huawei technical support website (https:// support.huawei.com/enterprise/en/index.html). Search for DP*Site.apk. XXXXX _Site.apk under Software & Tools.