Parts Included
6
Lag Screw
SS-10.1006
Wall Anchor
6
SS-10.1002
Spacer
6
SS-10.1007
4
Bolt (M10-1.5 x 55)
SS-10.1077
4
Washer
SS-10.1009
2
Rail
SS-10.1074
Recommended Tools
Wrench/Socket
1/2" (13mm)
3/32"
9/16" (14mm)
7/32"
11/16" (17mm)
1/4"
● READ ALL INSTRUCTIONS AND CHECK PARTS BEFORE STARTING INSTALLATION
Planning
● RETAIN ALL PACKING MATERIALS UNTIL INSTALLATION IS COMPLETE
NOTE: This kit is best suited for doors up to 1-
150 pounds.
Before installing the Rail, identify secure points to attach the Rail.
For most wall installations, it is necessary that the Lag Screws are secured to wall studs.
80" [2032mm]
A
A
A
A
B
Door
Height
(H)
A - 8" [203mm]
3
/
B - 4" [102mm]
Barn Door Rail Kit
Installation Manual
4
Socket Head Screw (M6)
SS-10.1004
Nut (M10-1.5)
4
SS-10.1010
4
4
2
Drill Bit
Allen Wrench
3/8"
3mm
7/16"
4mm
A
A
A
A
" [9.5mm] Gap
8
2
Door Guide
Floor Anchor
SS-10.1013
SS-10.1011
1-1/4" Screw
1
SS-10.1012
3/4" Screw
Joint Plate
SS-10.1075
SS-10.1003
Driver Bit
#8 Phillips
3
/
" thick, up to 36" wide, and no more than
8
For Lag Screws that cannot be secured to a
wall stud, it will be necessary to use the
A
Wall Anchors to secure the Lag Screws
into the wall.
B
Home construction varies; holes may be
added to the Rail to allow Lag Screws
to attach to wall studs.
IMPORTANT:
(H)
plus
If at least FOUR Lag Screws cannot
1-
5
/
"
8
be secured to wall studs or other
[41.5mm]
structural points, DO NOT INSTALL
THIS RAIL KIT.
2
Door Stop
SS-10.1005
2
Anti-Jump Pad
SS-10.1076
2'-3' Level
Power Drill
4310493
W-KIT-6-BK-2PC
Iron Black
2
Hayden
Trolley
SS-10.1053
Tape Measure
12'

Advertisement

loading
Need help?

Need help?

Do you have a question about the 4310493 and is the answer not in the manual?

Questions and answers

Summary of Contents for Forge 4310493

  • Page 1 Barn Door Rail Kit 4310493 W-KIT-6-BK-2PC Installation Manual Iron Black Parts Included Lag Screw Socket Head Screw (M6) SS-10.1006 SS-10.1004 Wall Anchor Nut (M10-1.5) SS-10.1002 SS-10.1010 Door Stop Door Guide SS-10.1005 Spacer Floor Anchor SS-10.1013 SS-10.1007 SS-10.1011 Bolt (M10-1.5 x 55) 1-1/4”...
  • Page 2 Planning (continued) Door Trolley Top Door to Bypass Trolley Bolt Door Thickness to Rail Center Rail Center Clearance Clearance Clearance Clearance (1) (3) ” ” ” ” ” ” ” 1” ” ” ” ” ” ” Allow at least 3/4” clearance above the trolley. The nominal distance with the door hung to run vertical and the wall straight and plumb.
  • Page 3 2 - Mount the Rail (Continued) IMPORTANT The widest part of the Spacer should be placed on the wall. Place a Lag Screw through the hole in the Rail aligning with the outermost pilot hole on one side, through a Spacer, and drive the Lag Screw into the pilot hole.
  • Page 4 5 - Install Door Guides and Secure Door Stops Locate the Door Guides on either side of the door, as close to the doorway as possible. See the diagram for proper spacing. ” Screw Door If the floor is not solid Thickness (T) wood, it may be Floor...