Forge W-KIT-4-BK-1PC Installation Manual

Barn door rail kit

Advertisement

Quick Links

Parts Included

5
Lag Screw
SS-10.1006
Wall Anchor
5
SS-10.1002
5
Spacer
SS-10.1007
Bolt (M10-1.5 x 50)
6
SS-10.1246
Washer
6
SS-10.1009
1
Rail
SS-20.1147

Recommended Tools

Wrench/Socket
1/2" (13mm)
3/32"
9/16" (14mm)
7/32"
11/16" (17mm)
1/4"
● READ ALL INSTRUCTIONS AND CHECK PARTS BEFORE STARTING INSTALLATION

Planning

● RETAIN ALL PACKING MATERIALS UNTIL INSTALLATION IS COMPLETE
NOTE: This kit is best suited for doors up to 1-
150 pounds.
Before installing the Rail, identify secure points to attach the Rail.
For most wall installations, it is necessary that the Lag Screws are secured to wall studs.
A
B
Door
Height
(H)
A - 16" [406mm]
3
/
B - 8" [204mm]
Barn Door Rail Kit
Installation Manual
Nut (M10-1.5)
6
SS-10.1010
Floor Anchor
4
SS-10.1011
4
3/4" Screw
2
SS-10.1075
Drill Bit
Allen Wrench
3/8"
3mm
7/16"
80" [2032mm]
A
A
A
" [9.5mm] Gap
8
2
Door Guide
SS-10.1013
1-1/4" Screw
SS-10.1012
Driver Bit
#8 Phillips
3
/
" thick, up to 36" wide, and no more than
8
For Lag Screws that cannot be secured to a
wall stud, it will be necessary to use the
Wall Anchors to secure the Lag Screws
into the wall.
B
Home construction varies; holes may be
added to the Rail to allow Lag Screws
to attach to wall studs.
IMPORTANT:
(H)
plus
If at least FOUR Lag Screws cannot
1-
5
/
"
8
be secured to wall studs or other
[41.5mm]
structural points, DO NOT INSTALL
THIS RAIL KIT.
2
Door Stop
SS-10.1005
2
Anti-Jump Pad
SS-10.1076
2'-3' Level
Power Drill
4310491
W-KIT-4-BK-1PC
Iron Black
2
Clyde
Trolley
SS-20.1172
Tape Measure
12'

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the W-KIT-4-BK-1PC and is the answer not in the manual?

Questions and answers

Summary of Contents for Forge W-KIT-4-BK-1PC

  • Page 1 Barn Door Rail Kit 4310491 W-KIT-4-BK-1PC Installation Manual Iron Black Parts Included Clyde Lag Screw Trolley SS-10.1006 SS-20.1172 Wall Anchor Nut (M10-1.5) SS-10.1002 SS-10.1010 Door Stop Door Guide SS-10.1005 SS-10.1013 Floor Anchor Spacer SS-10.1011 SS-10.1007 Bolt (M10-1.5 x 50) 1-1/4” Screw SS-10.1246...
  • Page 2 Planning (continued) Door Trolley Top Door to Bypass Trolley Bolt Door Thickness to Rail Center Rail Center Clearance Clearance Clearance Clearance (1) (3) ” ” ” ” ” ” ” 1” ” ” ” ” ” ” Allow at least 3/4” clearance above the trolley. The nominal distance with the door hung to run vertical and the wall straight and plumb.
  • Page 3 2 - Mount the Rail (Continued) IMPORTANT The widest part of the Spacer should be placed on the wall. Place a Lag Screw through the hole in the Rail aligning with the outermost pilot hole on one side, through a Spacer, and drive the Lag Screw into the pilot hole.
  • Page 4 5 - Install Door Guides and Secure Door Stops Locate the Door Guides on either side of the door, as close to the doorway as possible. See the diagram for proper spacing. ” Screw Door If the floor is not solid Thickness (T) wood, it may be Floor...