Download Print this page

Forge W-TRLY-4-BK Installation Manual

Barn door trolley kit

Advertisement

Quick Links

Parts Included
Floor Anchor
4
SS-10.1011
4
1-1/4" Screw
SS-10.1012
2
3/4" Screw
SS-10.1075
Recommended Tools
Wrench/Socket
1/2" (13mm)
3/32"
9/16" (14mm)
7/32"
11/16" (17mm)
1/4"
● READ ALL INSTRUCTIONS AND CHECK PARTS BEFORE STARTING INSTALLATION
Planning
● RETAIN ALL PACKING MATERIALS UNTIL INSTALLATION IS COMPLETE
REQUIRED PARTS (Sold Separately)
Lag Screws
NOTE: This kit is best suited for hanging a single door up to 1-
wide on a 5mm x 40mm (3/16" x 1-9/16") Rail, and no more than 150 pounds total
for all doors hung on any Rail. All dimensions refer to
other parts may require adjustments to installation planning.
Before installing the Rail, identify secure points to attach the Rail.
If Lag Screws cannot be secured to wall studs or other structural points, DO NOT INSTALL
THIS KIT.
Home construction varies; holes may be added to the Rail to allow Lag Screws to attach
to wall studs.
A
B
Door
Height
(H)
Barn Door Trolley Kit
Installation Manual
2
Anti-Jump Pad
2
SS-10.1076
Drill Bit
Allen Wrench
3/8"
3mm
7/16"
Rail
Spacers
Rail Length (L)
A
A
A
3
/
Door Guide
2
SS-10.1013
4
Driver Bit
2'-3' Level
#8 Phillips
OPTIONAL PARTS (Sold Separately)
Length (L) of
each Rail
96"
B
80"
64"
(H)
48"
plus
1-
/
"
11
16
" Gap
8
Door Stop
2
Marshall
SS-10.1005
Trolley
SS-20.1169
Trolley Screw (M6 x 35mm)
SS-20.1197
Power Drill
Bypass Brackets
Soft Close Mechanism
Rail Connectors
3
/
" thick and up to 36"
8
brand parts. Use of
A
B
16"
8"
16"
8"
16"
8"
16"
8"
4310627
W-TRLY-4-BK
Iron Black
Tape Measure
12'
No. of Lag
Screws for
each Rail
6
5
4
3

Advertisement

loading
Need help?

Need help?

Do you have a question about the W-TRLY-4-BK and is the answer not in the manual?

Questions and answers

Summary of Contents for Forge W-TRLY-4-BK

  • Page 1 Barn Door Trolley Kit 4310627 W-TRLY-4-BK Installation Manual Iron Black Parts Included Floor Anchor SS-10.1011 Door Guide Door Stop Marshall SS-10.1013 SS-10.1005 1-1/4” Screw Trolley SS-10.1012 SS-20.1169 Anti-Jump Pad 3/4” Screw Trolley Screw (M6 x 35mm) SS-10.1076 SS-10.1075 SS-20.1197 Recommended Tools...
  • Page 2 Planning (continued) Door Trolley Top Door to Bypass Trolley Door Thickness to Rail Rail Center Clearance Clearance Clearance (1) (3) ” 6” ” ” ” ” 1” 6” ” ” ” ” Allow at least 3/4” clearance above the trolley. The nominal distance with the door hung to run vertical and the wall straight and plumb.
  • Page 3 2 - Mount the Rail IMPORTANT The widest part of the Spacer should be placed on the wall. Place a Lag Screw through the hole in the Rail aligning with the outermost pilot hole on one side, through a Spacer, and drive the Lag Screw into the pilot hole.
  • Page 4 5 - Install Door Guides and Secure Door Stops Locate the Door Guides on either side of the door, as close to the doorway as possible. See the diagram for proper spacing. ” Screw Door If the floor is not solid Thickness (T) wood, it may be Floor...

This manual is also suitable for:

4310627