Page 1
Barn Door Trolley Kit 4310627 W-TRLY-4-BK Installation Manual Iron Black Parts Included Floor Anchor SS-10.1011 Door Guide Door Stop Marshall SS-10.1013 SS-10.1005 1-1/4” Screw Trolley SS-10.1012 SS-20.1169 Anti-Jump Pad 3/4” Screw Trolley Screw (M6 x 35mm) SS-10.1076 SS-10.1075 SS-20.1197 Recommended Tools...
Page 2
Planning (continued) Door Trolley Top Door to Bypass Trolley Door Thickness to Rail Rail Center Clearance Clearance Clearance (1) (3) ” 6” ” ” ” ” 1” 6” ” ” ” ” Allow at least 3/4” clearance above the trolley. The nominal distance with the door hung to run vertical and the wall straight and plumb.
Page 3
2 - Mount the Rail IMPORTANT The widest part of the Spacer should be placed on the wall. Place a Lag Screw through the hole in the Rail aligning with the outermost pilot hole on one side, through a Spacer, and drive the Lag Screw into the pilot hole.
Page 4
5 - Install Door Guides and Secure Door Stops Locate the Door Guides on either side of the door, as close to the doorway as possible. See the diagram for proper spacing. ” Screw Door If the floor is not solid Thickness (T) wood, it may be Floor...
Need help?
Do you have a question about the W-TRLY-4-BK and is the answer not in the manual?
Questions and answers