General Installation Instructions
These instructions should be read carefully prior to any installation and retained after completion for further
reference and maintenance. Please give these instructions to the building owner/occupier after installation.
Important Safety
Before installation, maintenance or lamp replacement, ensure that the mains supply to the luminaire is switched off and the circuit supply fuses are removed or
the circuit breaker is turned off.
It is recommended that only a qualified electrical contractor carries out the installation of this luminaire and that the luminaire is installed in compliance with the
current edition of the IEE Wiring Regulations.
The person carrying out the installation is to check and verify that the total load on the circuit, including that of this luminaire does not exceed the rating of the
circuit cable, fuse or circuit breaker.
Where a luminaire incorporates discharge control gear (inductive load), the circuit capacity and ratings require careful sizing to avoid nuisance tripping of the
protective device used in the installation.
Where applicable, careful consideration should be taken during installation to ensure that all fixings and/or suspensions are of a suitable size for the luminaire
being installed.
Ratings
1. All luminaires are manufactured & tested in compliance with the requirement contained within BS EN 60598 and are CE marked.
2. All luminaires that are of Class 1 construction and that are marked accordingly, MUST be earthed.
3. All luminaires are designed to operate at 230Volts AC -6%/+10% = 216Volts to 252Volts. Do not operate outside these voltages.
4. All luminaires are only suitable for applications within their rated Ingress Protection limits as stated.
5. Max Ambient Temperature 25
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Installation :-
 Please ensure the luminaire is mounted onto solid walls or structures and with suitable screws and fixings.
 Connect the battery leads
 Connect the unswitched mains supply to the input terminal block in accordance with the markings.
Commissioning Instructions :-
 After connecting the mains supply check that the charge indicator LED is illuminated and that the lamp(s) are not illuminated.
 A charge period of 24-hours should be allowed before testing the unit for its rated duration.
 The recommended maximum battery storage period of one year should not be exceeded.
 If the battery has been left in a discharged state, a full charge and discharge cycle may be necessary to restore full battery capacity.
Safety Warning :-
This product contains one or two sealed Lead Acid batteries which contain an electrolyte that can be poisonous and harmful to the eyes. Care
must be taken not to damage the battery case which would allow electrolyte to escape. When handling take care not to short out the terminals of
the battery (i.e. with rings, bracelets, watch, screwdriver etc) as this could cause high electrical currents resulting in injury by burning. If the
battery electrolyte touches the skin wash off immediately with water.
Battery Connection :-
Do not connect the battery until there is reliable mains supply. If the product regularly operates in the emergency mode the battery life may be
compromised. The date that the battery is connected should be written onto the battery connection label. Having completed the installation and
connected the battery check that the green battery charge and lamp filament indicator is on. We recommend the batteries be charged for 48
hours before the first test.
Installation of Emergency Luminaires – Additional Instructions to above
Connect as follows:-
Warning
 Failure to comply with these instructions may result in irreparable damage to the emergency control gear.
 This product must not be modified in any way as this will negate any Safety approvals, and may render the product inoperable or unsafe. The
product must be installed in accordance with the instructions.
 DO NOT deep discharge the batteries pack in emergency output for over a period of 48hrs as this will cause irreparable damage to
the battery.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Page No. 1
Description – IP65 Owl 5W LED Twin Spot
Installation Instructions
Luminaire Code(s) –
o
C
PERMANENT LIVE
NEUTRAL
EARTH
Self Test Emergency Non-maintained
ATSLED/3NM/IP65/ST
(L)
BROWN OR RED (continuous)
(N)
BLUE OR BLACK
GREEN / YELLOW
www.anselluk.com
Issue Date: td 20140725

Advertisement

loading
Need help?

Need help?

Do you have a question about the ATSLED/3NM/IP65/ST and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Ansell ATSLED/3NM/IP65/ST

  • Page 1 Description – IP65 Owl 5W LED Twin Spot Self Test Emergency Non-maintained Installation Instructions ATSLED/3NM/IP65/ST Luminaire Code(s) – General Installation Instructions These instructions should be read carefully prior to any installation and retained after completion for further reference and maintenance. Please give these instructions to the building owner/occupier after installation.
  • Page 2 Self Test Operating and recommended Routine Test Procedure Please refer to the literature below as to the functionality of Self Test Emergency. Read these instructions carefully to ensure safe and reliable operation of this emergency luminaire. The following operations are designed to ensure the continued protection of your premises and occupants, in the event of the possibility of a failure of the normal lighting supply.