Ansell AKTLED/3M/ST Installation Instructions

Led bulkhead self test emergency

Advertisement

Quick Links

General Installation Instructions

These instructions should be read carefully prior to any installation and retained after completion for further
reference and maintenance. Please give these instructions to the building owner/occupier after installation.

Important Safety

1.
Before installation, maintenance or lamp replacement, ensure that the mains supply to the luminaire is switched off and the circuit supply fuses are removed or
the circuit breaker is turned off.
2.
It is recommended that only a qualified electrical contractor carries out the installation of this luminaire and that the luminaire is installed in compliance with the
current edition of the IEE Wiring Regulations.
3.
The person carrying out the installation is to check and verify that the total load on the circuit, including that of this luminaire does not exceed the rating of the
circuit cable, fuse or circuit breaker.
4.
Where a luminaire incorporates discharge control gear (inductive load), the circuit capacity and ratings require careful sizing to avoid nuisance tripping of the
protective device used in the installation.
5.
Where applicable, careful consideration should be taken during installation to ensure that all fixings and/or suspensions are of a suitable size for the luminaire
being installed.

Ratings

1. All luminaires are manufactured & tested in compliance with the requirement contained within BS EN 60598 and are CE marked.
2. All luminaires that are of Class 1 construction and that are marked accordingly, MUST be earthed.
3. All luminaires are designed to operate at 230Volts AC -6%/+10% = 216Volts to 252Volts. Do not operate outside these voltages.
4. All luminaires are only suitable for applications within their rated Ingress Protection limits as stated

Exclusions to Warranty

Please Note - The limited warranty shall be null and void in the following circumstances:-
Failure by the installer, end user or any third party to exercise caution to protect any covered product or part from outside damage, adverse temperature (normal
operating ambient temperature 0 - 25°C), humidity conditions, fluctuations in the electrical system or physical abuse as well as failure related to workmanship in the
installation of the products or parts.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

INSTALLATION

Select a suitable mounting surface and provide a suitable power supply.
Remove the luminaire cover/diffuser by removing the screws with a screwdriver.
Release the hinged gear tray by simultaneously pressing the two retaining clips in the direction shown.
Fix the base to the required surface ensuring an appropriate fixing method is used to support the luminaire and without compromising the
IP rating of the luminaire.
It is the installer's responsibility to provide adequate electrical connections to maintain the correct IP rating for the installed environment.
This is in accordance to BS EN 7671
Bring in the incoming supply through the base and terminate into the terminal block on the gear tray.

Electrical Connection

Connect as follows:-
PERMANENT LIVE
SWITCHED LIVE
EARTH
NEUTRAL
Connect the battery plug to the PCB board where indicated.
Refit the gear tray.
Fix the cover / diffuser into position and tighten fixing screws ensuring that adequate compression is present.
Optional - Select desired legend design, align and attach adhesive strips on the front diffuser.
Switch on the mains supply. Check the unit operates correctly.
Check the LED indicator is GREEN and ON.
Note
Switch on the mains supply. Check the unit operates correctly.
Check the LED indicator is ON and GREEN.
Leave the unit on charge for one hour, then remove the supply to simulate mains failure and check the lamp operates in emergency mode.
The unit requires 48 hours to fully charge the battery and achieve 3 hours emergency operation.
DO NOT deep discharge the batteries pack in emergency output for over a period of 48hrs as this will cause irreparable damage
to the battery.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Page No. 1
Description –
Installation Instructions
®
Luminaire Code(s) –
(L)
BLACK (continuous)
(L1)
BROWN (switched)
GREEN / YELLOW
(N)
BLUE
www.anselluk.com
3.5W 6500K IP65 KITE LED Bulkhead
Self Test Emergency Maintained / Non-maintained
AKTLED/3M/ST
Issue Date: td 20151202

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKTLED/3M/ST and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Ansell AKTLED/3M/ST

  • Page 1 3.5W 6500K IP65 KITE LED Bulkhead Self Test Emergency Maintained / Non-maintained Installation Instructions ® AKTLED/3M/ST Luminaire Code(s) – General Installation Instructions These instructions should be read carefully prior to any installation and retained after completion for further reference and maintenance. Please give these instructions to the building owner/occupier after installation.
  • Page 2 ® Self Test Operating and recommended Routine Test Procedure Please refer to the literature below as to the functionality of Self Test Emergency. Read these instructions carefully to ensure safe and reliable operation of this emergency luminaire. The following operations are designed to ensure the continued protection of your premises and occupants, in the event of the possibility of a failure of the normal lighting supply.

Table of Contents