Appendix C
Configuring the Switch with the CLI-Based Setup Program
Connecting to a Power Source
Follow these steps to connect to a power source:
Connect one end of the supplied AC power cord to the power connector on the switch rear panel, as
Step 1
shown in
Figure C-2
1
2
Connect the other end of the power cable to a grounded AC outlet.
Step 2
As the switch powers on, it begins the power-on self-test (POST), a series of tests that run automatically
to ensure that the switch functions properly. If POST fails, see
determine a course of action.
Connecting to the Console Port
You can use the console port to perform the initial configuration. To connect the switch console port to
a PC, use the supplied RJ-45-to-DB-9 adapter cable.
Follow these steps to connect the PC or terminal to the switch:
Using the supplied RJ-45-to-DB-9 adapter cable, insert the RJ-45 connector into the console port on the
Step 1
rear of a switch, as shown in
OL-6157-01
Figure
C-2.
Connecting Switch to AC Power
2
Switch
AC power cord
Figure
C-3.
Catalyst 2940 Switch Hardware Installation Guide
Connecting to a Power Source
1
Chapter 3, "Troubleshooting,"
to
C-3