Advertisement

Quick Links

ADS5440/44/63/74 EVM
User's Guide
November 2006
SLAU194A
Downloaded from
Elcodis.com
electronic components distributor

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS5440 EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments ADS5440 EVM

  • Page 1 ADS5440/44/63/74 EVM User's Guide November 2006 SLAU194A Downloaded from Elcodis.com electronic components distributor...
  • Page 2 SLAU194A – October 2006 – Revised November 2006 Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 3: Table Of Contents

    Contents ........................Overview ......................Purpose .................... EVM Basic Functions .................... Power Requirements ............... ADS5463 EVM Operational Procedure ...................... Circuit Description ....................Schematic Diagram ....................Circuit Function ....................... Test Points ....................ADC Options ....................Physical Description ...................... PCB Layout ....................Bill of Materials ....................
  • Page 4 List of Figures ........................Smith Chart .................... THS9001 + ADS5463 FFT Plot ......................Top Silkscreen ......................Component Side ......................Ground Plane 1 ......................Power Plane 1 ......................Power Plane 2 ......................Ground Plane 2 ......................... Bottom Side ......................EVM Schematics ......................
  • Page 5: Overview

    User's Guide SLAU194A – October 2006 – Revised November 2006 ADS5440/44/63/74 EVM Overview This user's guide gives a general overview of the ADS5440/44/63/74 evaluation module (EVM) and provides a general description of the features and functions to be considered while using this module. Purpose The EVM provides a platform for evaluating the analog-to-digital converter (ADC) under various signal, reference, and supply conditions.
  • Page 6: Three-Pin Jumper List

    www.ti.com Overview Table 1. Three-Pin Jumper List JUMPER FUNCTION LOCATION: PINS 1–2 LOCATION: PINS 2–3 DEFAULT Provides AIN+ source to Source provided from Source provided from T2 2–3 ADS5463 differential amplifier Provides AIN– source to Source provided from Source provided from T2 2–3 ADS5463 differential amplifier...
  • Page 7: Circuit Description

    www.ti.com Circuit Description Circuit Description Schematic Diagram The schematic diagram for the EVM is attached to the end of this document. Circuit Function The following sections describe the function of individual circuits. Refer to the relevant data sheet for device operating characteristics. 2.2.1 Power Power is supplied to the EVM via banana jack sockets.
  • Page 8: Smith Chart

    www.ti.com Circuit Description 2.2.3 Analog Inputs The EVM can be configured to use either a balun-coupled input or a TI 9001 amplifier input, both from a single-ended source. The inputs are provided via SMA connectors J11 for a balun coupled input and J10 for the amplifier input.
  • Page 9: Ths9001 + Ads5463 Fft Plot

    www.ti.com Circuit Description 2. One can use two TI THS9001 IF amplifiers to drive the ADC by applying an input to J10. Reconfigure JP3 and JP4, such that both have pins 1 and 2 shorted. To provide power to the amplifiers, connect 5 Vdc to J18 and connect the ground return to J19.
  • Page 10: Test Points

    www.ti.com Circuit Description 2.2.4 Digital Outputs The LVDS digital outputs can be accessed through the J5 output connector. A parallel 100-Ω termination resistor must be placed at the receiver to properly terminate each LVDS data pair. The supplied logic analyzer breakout board includes the 100-Ω terminations at the logic analyzer probe point. If using the logic analyzer breakout board, Table 3 use for configuration details.
  • Page 11: Physical Description

    www.ti.com Physical Description Physical Description This chapter describes the physical characteristics and PCB layout of the EVM. PCB Layout The EVM is constructed on a 6-layer, 0.062-inch thick PCB using FR-4 material. The individual layers are shown in Figure 3 through Figure 9.
  • Page 12: Component Side

    www.ti.com Physical Description K002 Figure 4. Component Side ADS5440/44/63/74 EVM SLAU194A – October 2006 – Revised November 2006 Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 13: Ground Plane

    www.ti.com Physical Description K003 Figure 5. Ground Plane 1 SLAU194A – October 2006 – Revised November 2006 ADS5440/44/63/74 EVM Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 14: Power Plane

    www.ti.com Physical Description K004 Figure 6. Power Plane 1 ADS5440/44/63/74 EVM SLAU194A – October 2006 – Revised November 2006 Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 15: Power Plane

    www.ti.com Physical Description K005 Figure 7. Power Plane 2 SLAU194A – October 2006 – Revised November 2006 ADS5440/44/63/74 EVM Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 16: Ground Plane

    www.ti.com Physical Description K006 Figure 8. Ground Plane 2 ADS5440/44/63/74 EVM SLAU194A – October 2006 – Revised November 2006 Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 17: Bottom Side

    www.ti.com Physical Description K007 Figure 9. Bottom Side SLAU194A – October 2006 – Revised November 2006 ADS5440/44/63/74 EVM Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 18: Bill Of Materials

    www.ti.com Physical Description Bill of Materials Table 4. Bill of Materials PART REFERENCE VALUE PCB FOOTPRINT MFR NAME MFR PART NUMBER NOTE C3, C55, C56, C57, 0.1 μF 0402 Panasonic ECJ-0EB1A104K C59, C60, C61, C62, C63, C64, C65, C66, C72, C78, C79, C80, C81, C83, C84, C86, C91, C92, C93 C24, C29, C37, C38...
  • Page 19: Pcb Schematics

    www.ti.com Physical Description PCB Schematics Figure 10. EVM Schematics SLAU194A – October 2006 – Revised November 2006 ADS5440/44/63/74 EVM Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 20: Evm Schematics

    www.ti.com Physical Description Figure 11. EVM Schematics ADS5440/44/63/74 EVM SLAU194A – October 2006 – Revised November 2006 Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 21: Evm Schematics

    www.ti.com Physical Description Figure 12. EVM Schematics Figure 13. EVM Schematics SLAU194A – October 2006 – Revised November 2006 ADS5440/44/63/74 EVM Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 22: Touchless Probe Breakout Board Schematic

    www.ti.com Physical Description Figure 14. Touchless Probe Breakout Board Schematic ADS5440/44/63/74 EVM SLAU194A – October 2006 – Revised November 2006 Submit Documentation Feedback Downloaded from Elcodis.com electronic components distributor...
  • Page 23: Fcc Warning

    EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 24: Important Notices

    TI as compliant with ISO/TS 16949 requirements. Buyers acknowledge and agree that, if they use any non-designated products in automotive applications, TI will not be responsible for any failure to meet such requirements. Following are URLs where you can obtain information on other Texas Instruments products and application solutions: Products...

This manual is also suitable for:

Ads5444 evmAds5463 evmAds5474 evm

Table of Contents