Sleipner SEP250 Installation Manual

Pro dc electric thruster
Hide thumbs Also See for SEP250:

Advertisement

Quick Links

Installation Guide
For Pro DC Electric Thruster Models
SEP250
DOCUMENT ID:
5246
REVISION:
15
DATE:
2025
EN
LANGUAGE:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SEP250 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sleipner SEP250

  • Page 1 Installation Guide For Pro DC Electric Thruster Models SEP250 DOCUMENT ID: 5246 REVISION: DATE: 2025 LANGUAGE:...
  • Page 2: Table Of Contents

    Failure to follow instructions within this document will render all warranties given by Sleipner Motor as VOID. Warnings and situations requiring extra caution are outlined in the documentation. Take extra consideration when warnings are outlined.
  • Page 3: Responsibility Of The Installer

    Ensure that you operate with high-quality batteries intended for maritime use. • All Sleipner proportional thrusters will work well with Lithium batteries, as the included PPC unit will control the output voltage to safe levels for the thruster. (NB: Ensure you have the latest embedded software installed. The fi rmware version of the Proportional Power Controller (PPC) must be of version 1.033 or later if the PPC is connected to a lithium battery).
  • Page 4: Product Dimensions

    Product Dimensions MC_0116 SE 250 Measurement Measurement description code inch Internal tunnel diameter 11,81 Motor Height 19,29 Width 13,27 Length 10,79 Water Depth 11,81 Minimum tunnel length 10,75 TL (recommended) Recommended tunnel length 13,11 T (min) Minimum tunnel wall thickness 0,39 T (max) Maximum tunnel wall thickness...
  • Page 5: Positioning Of The Tunnel / Thruster

    Positioning of the tunnel / thruster MC_0003 1. Aim to install the thruster as far forward as possible Due to the leverage effect around the boats’ pivot point. The distance difference from the boat pivots’ point to the thruster will determine the amount of real rotation power for the boat.
  • Page 6: Tunnel Length

    Tunnel Length MC_0003 Optimal tunnel length Achieving the correct tunnel length depends on many factors from the hull type, operation and environmental conditions. Tunnels should avoid being longer than 4 x the tunnel diameter as this will reduce thruster performance. (NB: Installing long length tunnels can flex/ bend over time and may require additional support.
  • Page 7: Tunnel Installation In Sailboats

    Tunnel installation in Sailboats MC_0003 Some sail boats have a flat bottom and shallow draft in the bow section. This can make installing the thruster as far forward from the boats main pivot point diffi cult. However, it is possible to install a tunnel thruster in most sail boats, even when the hull does not directly support the fi tting of a tunnel. Instead fi t the tunnel halfway into the underneath section of the existing hull.
  • Page 8: Water Deflection

    Water Deflection MC_0003 A possible problem in sail boats or fast powerboats is that a non-rounded surface can generate drag from the back face of the tunnel, as it creates a “flat” area facing the flow of water. This problem can be solved in two different ways, depending on what is possible or easier to perform. The best solution which generally reduces the most drag is to make a recess in the hull at the back of the tunnel.
  • Page 9: Tunnel Ends

    This “free” extra thrust in optimal installations be 30 - 40% of the total thrust. (NB: A Sleipner thruster propeller does not produce cavitation at working speed. Therefore, any cavitation and cavitation noise in the tunnel will be caused during improper tunnel installation.)
  • Page 10: Tunnel Installation

    Tunnel Installation MC_0003 The following are only general instructions and do not explain in any way the details of fi breglass work. Problems caused by faulty installation of the tunnel, are the installers full responsibility. Seek a professional boat builder when modifying the hull. Find the position in the boat considering the information earlier in this manual and the applicable measurements for the thruster model you are installing.
  • Page 11 You must apply gel coat to areas you have grounded/ moulded to make waterproof. These areas allow water access to the hull which is typically not waterproof without these applications outside. (NB: All original Sleipner tunnels are fully waterproof when delivered except in the areas where you have cut and bonded it to the hull.)
  • Page 12: Stern Tunnel Installation

    Stern Tunnel Installation MC_0003 For Stern Thruster installation please refer to the supplied manual in your Sleipner product delivery Installation Guide For DC Electric Thruster Models SE80, SE100, SE120, SE130, SE150 Stern Thruster SLEIPNER AS DOCUMENT ID: 222222 REVISION: P.O. Box 519...
  • Page 13: Gear Leg & Motor Bracket Installation

    Gear Leg & Motor Bracket Installation MC_0001 Please refer to the graphic for special considerations relating to your model Mark the tunnel centreline and the boat’s centreline. (NB: Install the gear leg and propeller as shown for the thrust direction to correspond with the control panel.
  • Page 14 Gear Leg & Motor Bracket Installation MC_0001 Please refer to the graphic for special considerations relating to your model Place the gear leg (without the propeller) with the gasket on inside the tunnel. Place the propeller on the gear leg (NB: Do not secure the propeller with securing parts) to ensure it is centred and rotates freely with the same clearance from each blade to the tunnel wall.
  • Page 15 Gear Leg & Motor Bracket Installation MC_0001 Please refer to the graphic for special considerations relating to your model Apply appropriate sealant to both sides of the gasket and place on the gear leg. Place the gear leg in the tunnel (without the propeller). Use appropriate sealant to ensure that no leakages occur.
  • Page 16: Propeller Installation

    Propeller Installation MC_0264 Please refer to the graphic for special considerations relating to your model Centre the drive pin and insert the propeller onto the shaft spline. Rotate the propeller until the drive pin aligns with the internal slot in the propeller.
  • Page 17: Motor Installation

    Motor Installation MC_0019 Please refer to the graphic for special considerations relating to your model Install the motor onto the motor bracket ensuring the couplings are engaged together correctly (top and bottom). (NB: The motor can be placed in all directions on the motor bracket. However, ensure the cable terminals are accessible for electrical installation later.) If you are installing the motor at an angle of more than 30 degrees off vertical, the motor will require separate/ additional support.
  • Page 18: Electrical Installation

    Wiring Diagram chapter for an overview. Sleipner offers both manual main switches and Automatic Main Switches (AMS). Sleipner AMS is controlled by the control panel in addition to the option of manual operation. Turning on the control panel also turn on the automatic main switch. When the control panel is turned off the automatic main switch is turned off.
  • Page 19: Electrical Reference Guide

    Electrical Reference Guide MC_0621 Cross Section Guide for Power Cables *Min. System Nominal Rec. <7m 7-14m 15-21m 22-28m 28-35m 36-45m Model Size battery Voltage current fuse total + & - total + & - total + & - total + & - total + &...
  • Page 20: Manual Main Switch Wiring Diagram 24V S-Link Thruster

    Manual Main Switch Wiring Diagram 24V S-Link Thruster The Top wiring setup is for a single bow OR stern thruster system Control panel See S-Link System Description chapter for detailed information on installation of S-Link POWER Cable, END Terminator and additional S-Link components. S-Link Backbone cable S-Link Spur cable ANL Fuse...
  • Page 21: Automatic Main Switch Wiring Diagram 24V S-Link Thruster

    Automatic Main Switch Wiring Diagram 24V S-Link Thruster The Top wiring setup is for a single bow OR stern thruster system Control See S-Link System Description chapter for detailed panel information on installation of S-Link POWER Cable, END Terminator and additional S-Link components. S-Link Backbone cable Automatic Main Switch S-Link Spur...
  • Page 22: S-Link System Description

    MC_0120 S-Link is a CAN-based control system used for communication between Sleipner products installed on a vessel. The system uses BACKBONE Cables as a common power and communication bus with separate SPUR Cables to each connected unit. Only one S-Link POWER cable shall be connected to the BACKBONE Cable.
  • Page 23: Control Panel Installation

    Control panel installation MC_0398 For Control Panel installation please refer to the Installation Guide accompanying the control panel to be installed. Installation Guide Control Panel SLEIPNER MOTOR AS DOCUMENT ID: REVISION: P.O. Box 519 N-1612 Fredrikstad DATE: Norway www.sleipnergroup.com LANGUAGE: SEP 250 &...
  • Page 24: Post-Installation Checklist

    Post installation checklist MC_0033 []..The bolts holding the gear leg and main bracket together are tightened correctly. []..The bolts holding the motor to its bracket are tightened correctly. []..All electrical connections are clean, dry and tight, and the correct cable, fuse and main switch size.
  • Page 25: Service And Support

    11. This warranty gives you specific legal rights, and you may also have other rights which vary from country to country. Patents MC_0024 At Sleipner we continually reinvest to develop and offer the latest technology in marine advancements. To see the many unique designs we have patented, visit our website www.sleipnergroup.com/patents SEP 250 & SEP 300...
  • Page 26 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SEP 250 & SEP 300 5246 2025...
  • Page 27 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SEP 250 & SEP 300 5246 2025...
  • Page 28 © Sleipner Motor AS, All rights reserved The information given in the document was right at the time it was published. However, Sleipner Motor AS cannot accept liability for any inaccuracies or omissions it may contain. Continuous product improvement may change the product specifi cations without notice.

Table of Contents