Sleipner SEP-IP100 Installation Manual

Sleipner SEP-IP100 Installation Manual

Pro ignition protected dc thruster
Hide thumbs Also See for SEP-IP100:

Advertisement

Quick Links

SLEIPNER AS
P.O. Box 519
N-1612 Fredrikstad
Norway
www.sleipnergroup.com
Installation Guide
For Pro Ignition Protected DC Thruster Models
SEP-IP100, SEP-IP130
DOCUMENT ID:
2705
REVISION:
9
DATE:
2021
EN
LANGUAGE:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SEP-IP100 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sleipner SEP-IP100

  • Page 1 Installation Guide For Pro Ignition Protected DC Thruster Models SEP-IP100, SEP-IP130 DOCUMENT ID: SLEIPNER AS 2705 REVISION: P.O. Box 519 DATE: N-1612 Fredrikstad 2021 Norway LANGUAGE: www.sleipnergroup.com...
  • Page 2: Table Of Contents

    Product Spare Parts and Additional Resources ....25 Warranty statement ............25 DECLARATION OF CONFORMITY MC_0020 Sleipner Motor AS P.O. Box 519, Arne Svendsensgt. 6-8 N-1612 Fredrikstad, Norway Declare that this product with accompanying standard control systems complies with the...
  • Page 3: Bow Installation Considerations And Precautions

    If installing S-link products DO NOT connect any other control equipment to the S-link controlled products except Sleipner original S-link products or via a Sleipner supplied interface product made for interfacing with other controls. Any attempt to directly control or at all connect into the S-link control system without the designated and approved interface will render all warranties and responsibilities for the complete line of Sleipner products connected void and null.
  • Page 4: Thruster Measurements

    Propeller position will vary with each thruster model Twin Propeller The gear leg/ propeller(s) must never extend out of the tunnel Tunnel centre line MG_0076 Thruster Measurements MC_0132 * IP 100 * IP 100 * IP 130 * IP 130 Measurement Measurement description code...
  • Page 5: Thruster Specifications

    - The electric thermal cut-off switch in electro motor protects against overheating (auto-reset when electro motor cools down). - Flexible coupling between electro-motor and drive shaft protects electro motor and gear system if propeller jams. - Original Sleipner panels shut off automatically 6 minutes after last use. - Original Sleipner panels use child-safe double ON buttons.
  • Page 6: Positioning Of The Tunnel / Thruster

    Pivot point important Lowered rotation power performance Stronger rotation power performance Water line Ø min 1/4 Ø (Recommended) min 1/4 Ø (Recommended) MG_0001 Positioning of the tunnel / thruster MC_0003 Aim to install the thruster as far forward as possible (1) Due to the leverage effect around the boats’...
  • Page 7: Tunnel Length

        Do not allow the variable length of the tunnel walls to vary in length excessively. EG. the top tunnel wall is x 4 longer than the bottom wall. Water flow must have space to "straighten" itself for best Cavitation performance.
  • Page 8: Tunnel Installation In Sailboats

      Pos. A Pos. B MG_0004 Tunnel installation in sailboats MC_0003 Some sail boats have a flat bottom and shallow draft in the bow section. This can make installing the thruster as far forward from the boats main pivot point diffi...
  • Page 9: Water Deflection

       High water force while underway High water force while underway from wave contact MG_0003 Water Deflection MC_0003 A possible problem in sail boats or fast powerboats is that a non-rounded surface can generate drag from the back face of the tunnel, as it creates “flat”...
  • Page 10: Tunnel Ends

    R = 0,1 x D (10%) Cavitation   Angled tunnel ends for steel/ aluminium hulls MG_0002 Tunnel Ends MC_0003 Rounded tunnel ends will maximise thrust and minimise noise and cavitation. For best performance round the tunnel connection to the hull-side as much as possible. The minimum rounding has a radius of 10% of the diameter of the tunnel.
  • Page 11: Tunnel Installation

    8 x layers of fiberglass and resin 8 x layers of fiberglass and resin MG_0005 Tunnel Installation MC_0003 IMPORTANT We recommend that a professional does the fi breglass, steel or aluminium fi tting of the tunnel. These instructions are only general instructions and do not explain in any way the details of fi...
  • Page 12 Hull Hull Layers of Layers of fiberglass fiberglass and resin and resin Tunnel Additional Layers of Hull fiberglass and resin Welding Tunnel *Fiberglass *Steel/ Hull Aluminium Hull Hull R = D x 0,1 Layers of fiberglass R = D x 0,1 and resin Tunnel Additional Layers of...
  • Page 13: Stern Tunnel Installation

    Stern Tunnel Installation MC_0003 Stern thruster installation has extra considerations and precautions and thruster installation procedures. See the attached manual supplied in the stern thruster kit Stern Thruster Installation Guide SEP IP 100 & SEP IP 130 & SEP IP 170 2705 2021...
  • Page 14: Thruster Installation Considerations And Precautions

    If installing S-link products DO NOT connect any other control equipment to the S-link controlled products except Sleipner original S-link products or via a Sleipner supplied interface product made for interfacing with other controls. Any attempt to directly control or at all connect into the S-link control system without the designated and approved interface will render all warranties and responsibilities for the complete line of Sleipner products connected void and null.
  • Page 15: Gear Leg & Motor Bracket Installation

    *P*IP 2 - 4 PORT STARBOARD *P*IP Boats ØC *P*IP Boats centre line *P*IP *P*IP centre line Measurement *P*IP *P*IP Tunnel Description inch inch centre line ØA 1.33 1.85 Tunnel 1.57 centre line ØC 0.35 0.43 ØA *P- Propositional *IP- Ignition Protected Stern PORT STARBOARD...
  • Page 16: Propeller Installation

    Drive Pin Propeller Washer Lock Nut Anti-fouling Anode Apply Loctite 243 or similar Anode Holding Screw MG_0033 Propeller Installation MC_0018 ! Please refer to the graphic for special considerations relating to your model ! Centre the drive pin and Insert the propeller onto the shaft spine. Rotate the propeller until the drive pin aligns with the internal slot in the propeller.
  • Page 17: Motor Installation

    IMPORTANT IMPORTANT! Ensure the holding key 2 - 5 The rubber/plastic element must and coupling are be in its correct position, fully aligned when fitted inserted but not compressed. a mm Holding Key 17mm b = a+1 mm > 30° FASTEN (33 Nm) Motor support...
  • Page 18: Thruster Electrical Installation

    IMPORTANT The Proportional Power Controller is a bulkhead (wall) mounted unit and must be installed in a dry and well-ventilated compartment. The unit also requires a 200mm minimum head clearance, 150mm minimum 200mm bottom clearance and a 100mm minimum clearance surrounding its remaining outer casing.
  • Page 19: Electrical Specifications

    Electrical Specifi cations MC_0044 SEP IP 100 & SEP IP 130 & SEP IP 170 2705 2021...
  • Page 20: Control Panel Cable Installation

    • Sleipner on/off equipment it is entirely “plug & play” and require no additional confi guration setup. See the Control panel manual for more information. SEP IP 100 & SEP IP 130 & SEP IP 170...
  • Page 21: S-Link Planning & Precautions

    - Round, compact and waterproof plugs with unique keying and colour coding to avoid faulty hookup. - An unlimited number of commands or information transfer on a single cable. - Proprietary Sleipner commands but built 100% on NMEA 2000 standard. Routing the Backbone: Keep routing backbone spur cables to a minimum.
  • Page 22: Technical Wiring Diagram

    Technical Wiring Diagram                             MG_0062 SEP IP 100 & SEP IP 130 & SEP IP 170 2705 2021...
  • Page 23: Control Panel Installation

    4x SCREWS Ø 4.5 mm Ø 4.5 mm 75.7 mm 58 mm 67 mm GASKET Ø 4.5 mm Ø 4.5 mm Ø 4.5 mm External alarm / buzzer connection (S-link) Supply + 12V / 24V DC Internal fuse / relay External alarm buzzer 12V / 24V DC - max 0,5A MG_0063...
  • Page 24: Checklist For Dc And Ip Thrusters

    Pre-delivery Checklist MC_0033 ..The bolts holding the gear house and motor bracket together are tightened correctly... The bolts holding the motor to its bracket are tightened correctly... All electrical connections are clean, dry and tight, and the correct cable, fuse and main switch size.
  • Page 25: Service And Support

    Patents MC_0024 At Sleipner we continually reinvest to develop and offer the latest technology in marine advancements. To see the many unique designs we have patented visit our website www.sleipnergroup.com/patents SEP IP 100 & SEP IP 130 & SEP IP 170...
  • Page 26 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SEP IP 100 & SEP IP 130 & SEP IP 170 2705 2021...
  • Page 27 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SEP IP 100 & SEP IP 130 & SEP IP 170 2705 2021...
  • Page 28 © Copyright Sleipner Motor AS, 2021 The information given in the document was correct at the time it was published. However, Sleipner Motor AS can not accept liability for any inaccuracies or omissions it may contain. Continuous product improvement may change the product specifi...

This manual is also suitable for:

Sep-ip130

Table of Contents