Table of Contents 1. Preparing for installation ___________________________ 3 1.1. Important note 1.2. Foundation 1.3. Anchoring the outdoor sauna 1.4. Tools required 1.5. Maintenance and cleaning 1.6. Disposal 2. Assembling the cabin _____________________________ 7 2.1. Mounting the feet 2.2. Assembling the barrel staves 2.3.
Read these assembly instructions carefully and keep them within reach. so that you can look up product information at any time. These assembly instructions can also be found in the downloads section of our website: www.mediabank.harvia.com. 1.1. Important note ● Check with your local planning authority (municipal office, magistrate) with respect to the building regulations and load standards.
Assembly instructions p. 4/8 ● When it rains, water can enter - the sauna barrel is not 100% watertight. To drain water from the floor, two holes are pre-drilled in the groove for the front and back walls of the lowest stave. These should be open at the bottom after the metal bands have been fitted, so that the water can drain away.
Page 5
Assembly instructions p. 5/8 ● Utility knife ● Ladder ● Saw This symbol indicates tips and useful information Pre-drill Cut to correct size Nailing Carry out wiring Check the right angle: 80 cm Handle glass with care: Special care must be taken with the edges of the glass —...
1.5. Maintenance and cleaning ● The sauna should be cleaned inside with a damp cloth. Use warm water only - if required, we recommend Harvia Sauna Cleaner (SAC25040 - Cleaning and disinfection) ● If the sauna will not be used for an extended period, we recommend heating the cabin once a month to prevent the formation of mould.
Assembly instructions p. 7/8 2. Assembling the cabin ATTENTION! Note the floor plan on Page 10 and illustrations from Page 9 onwards. 2.1. Mounting the feet Place the impregnated feet[1,33] on the foundation (see page 9) as shown in the illustration (see page 12).
Assembly instructions p. 8/8 Mount the tensioning bands[24] (see page 18). Before tensioning the metal bands, remove the screws from the staves. Note that the tension rods[23,25,26,27] are positioned in the lower half of the barrel sauna. Tighten the metal bands so that there is no visible gap between the staves. This must be checked regularly and retightened if necessary.
Pictures p. 11/23 2031 x 747 x 65 mm 2095 x 817 x 65 mm 585 x 332 x 65 mm 2160 x 735 x 65 mm 2095 x 817 x 65 mm 2031 x 747 x 65 mm 525 x 133 x 65 mm 1660 x 45 x 16 mm 1690 x 28 x 28 mm 650 x 45 x 16 mm...
Page 24
GLOBAL: Harvia Finland Oy I P.O. Box 12 I Teollisuustie 1-7 I 40951 Muurame I FINLAND I +358 207 464 000 I harvia@harvia.fi CENTRAL EUROPE: Harvia Austria GmbH | Wartenburger Straße 31 I A-4840 Vöcklabruck I +43 (0) 7672/22900-50 | info@harvia.com...
Need help?
Do you have a question about the 1-053-427 and is the answer not in the manual?
Questions and answers