Srne SR-EOM User Manual

Lithium battery for campervan

Advertisement

Quick Links

SR-EOM Lithium Battery for Campervan
SRNE Solar Co., Ltd.
4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China
User Manual
V1.3
T: +86 0755-26458295
F: +86 0755-27325578
File version: V1.3
E: master@szshuori.com
Page 1 of 27
W: www.srnesolar.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SR-EOM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Srne SR-EOM

  • Page 1 File version: V1.3 SR-EOM Lithium Battery for Campervan User Manual V1.3 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 1 of 27 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 2: Range Of Application

    If you have any suggestions during the use, please do not hesitate to give us feedback. 1.1 Range of Application The installation and user manual of SR-EOM series is applicable to the installation and use of the following products:...
  • Page 3: Safety Precautions

    Do not place or install near flammable or explosive materials Risk of Fire, Explosion or Burns The Energy storage system should not be disposed together with the household waste. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 4: General Safety

    DANGER! weather, such as thunder, rain, snow, and gale level 6. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 5: Personnel Safety

    ● Never place the battery in the fire to avoid explosion and prevent the personal safety from being endangered. ● Do not place the battery module in water or other liquids. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 6: Personnel Requirements

    Never install or remove any power cables when the power is on. The electric arcs or sparks may be generated at the moment when the power cable contacts with the conductor, which may cause fire or personal injuries. DANGER! SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 7: Grounding Requirements

    ● Do not place any inflammable or explosive items around the device. ● When the device is running, do not block the ventilation vent or heat dissipation system to prevent fire caused by high temperature. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 8: Product Introduction

    150W Communication interfaces CAN / RS485 / RV-C / USB / WiFi / Bluetooth Lithium Battery Standard UN38.3,MSDS,EN55032,EN55024,EN61000-3-2,EN61000-3-3 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 8 of 27 F: +86 0755-27325578...
  • Page 9: Model Coding

    04 The battery capacity is 4kWh ② Energy storage capacity 10: The battery capacity is 10kWh 3.3 Dimentions Battery dimensions(L*W*H):410*206*328mm SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 9 of 27 F: +86 0755-27325578...
  • Page 10: Appearance Description

    2:GND 3:SW1 ① RJ45 4:SW2 7:RS485-5-A 8:RS485-5-B 1-RS485-B BAT-IN 2-RS485-A ②⑫ RJ45 BAT-OUT 7-RS485-A 8-RS485-B SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 10 of 27 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 11: Application Scenarios

    BMS system, which can be easily expanded to form a battery pack of up to 64.16Kwh. The battery storage can be combined with SRNE brand inverter to form an on-grid or off-grid photovoltaic system, which can solve the problem of electricity consumption in areas without electricity.
  • Page 12: System Installation

    12.8V,4.01kWh Screw M10*30 5.2 Preparation of Tools and Meters Types Tools and meters Installation tool SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 12 of 27 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 13: Installation Space Requirements

    ● When handling the device by hand, wear protective gloves to avoid injury. 5.3.2 Installation Space Requirements The battery should be placed in the right position first, and the installation site should be smooth. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 14: Device Installation

    Determine the i nstallation location, please choose a flat ground and a solid wall as the installation location. First, determine the installation position of the base, the fixed size is 410*203mm. Secure the battery to the mounting plate using the screws. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 15: Electrical Connection

    , then remove the battery terminal cover plate and screws,prepare the appropriate power cable, crimp the terminal block, and then connect it to the battery. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 16 6.2.2 Connecting Signal Line The signal line shall be used to connect CAN/RS485 interface for battery module and inverter. The communication port of the SRNE brand inverter needs to be connected to the RS485 interface. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 17 If there are multiple batteries, you need to connect the communication line of each battery.Battery and battery connection use BAT-IN/ BAT-OUT interface, battery and inverter connection need RS485/CAN interface. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 18: System Debugging

    Secondly, turn on the battery switch button and the battery starts to work.If there are multiple modules, please turn on the power switch one by one. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 19: System Status Indication

    LED blinking description Blinking LED ON LED OFF Blinking1 0.25S 3.75S Blinking2 0.1S 0.1S Blinking3 0.5S 1.5S SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 19 of 27 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 20: Capacity Indicator

    External LCD display can be used as the display unit of the lithium battery, which can display the current operating information of the lithium battery,connect to battery LCD port. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 21 When PIN5 is connected with PIN6, the battery will turn on. Remote switch on/off When PIN5 is disconnected from PIN6, the battery will turn off. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 22: System Maintenance

    Check if the grounding cable is grounded reliably. and testing, and once every six reliability months to one year thereafter. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 22 of 27 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 23 3. The batteries should be handled with care, and damage to batteries should be strictly prohibited. 4. Requirements for the storage environment: – Ambient temperature: -10℃ to 55 ℃, recommended storage temperature: 20℃ to 30℃. – Relative humidity: 5%RH-80%RH. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 24 Ambient temperature for storage Relative humidity for storage environment Storage Time <-10℃ Prohibited -10~25℃ 5%~70% ≤12 months 30%≤SOC≤60% SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 24 of 27 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 25: Replacement Of Fuse

    9 Product Dimensions and Packaging 9.1 Product Dimensions The external dimensions of the energy storage battery module and power module are 410*328*206mm. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 25 of 27 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 26: Package Dimensions

    SC70-8 Package Battery Screwc M8*30 Package Battery Package Touch Screen LCD WX040-WTC (Optional) SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 26 of 27 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 27 Remote switch CZ3457 (Optional) Battery Remote Package Switch Wiring (Optional) Battery User Manual Standard Package SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 27 of 27 F: +86 0755-27325578 W: www.srnesolar.com...

This manual is also suitable for:

Sr-eom04b

Table of Contents