Srne SR-EOS05B User Manual

Energy storage battery

Advertisement

Quick Links

SR-EOS05B Energy Storage Battery
SRNE Solar Co., Ltd.
4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China
User Manual
V1.0
T: +86 0755-26458295
F: +86 0755-27325578
File version: V1.0
E: master@szshuori.com
Page 1 of 37
W: www.srnesolar.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SR-EOS05B and is the answer not in the manual?

Questions and answers

Summary of Contents for Srne SR-EOS05B

  • Page 1 File version: V1.0 SR-EOS05B Energy Storage Battery User Manual V1.0 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 1 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 2: Range Of Application

    Registered Jack 45 State Of Charge Charge C-rate RS485 RS485 Communication Interface Controller Area Network SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 2 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 3: Safety Precautions

    Do not touch the product in 5mins after shutdown Comply with RoHS standard The Energy storage system should not be disposed together with the household waste. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 4: General Safety

    DANGER! weather, such as thunder, rain, snow, and gale level 6. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 5: Personnel Safety

    ● Never place the battery in the fire to avoid explosion and prevent the personal safety from being endangered. ● Do not place the battery module in water or other liquids. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 6: Personnel Requirements

    Never install or remove any power cables when the power is on. The electric arcs or sparks may be generated at the moment when the power cable contacts with the conductor, which may cause fire or personal injuries. DANGER! SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 7: Grounding Requirements

    ● Do not place any inflammable or explosive items around the device. ● When the device is running, do not block the ventilation vent or heat dissipation system to prevent fire caused by high temperature. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 8: Product Introduction

    Storage time / temperature 6 months @25℃;3 months @35℃;1 months @45℃; Charging temperature range 0~45℃ Discharging temperature range -10~45℃ SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 8 of 37 F: +86 0755-27325578...
  • Page 9: Model Coding

    B: Energy storage battery ③ Product category C: Power conversion module S: Energy storage system 3.3 Appearance Description SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 9 of 37 F: +86 0755-27325578...
  • Page 10 (State of Capacity) ⑰ ⑱ ⑲ ⑳ Handle Mounting Frame Grounding screw Side fastener ㉑ Button SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 10 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 11: Application Scenarios

    BMS system, which can be easily expanded and can be combined into 45Kwh battery pack at most. The battery storage can be combined with SRNE brand inverter to form an on-grid or off-grid photovoltaic system, which can solve the problem of electricity consumption in areas without electricity.
  • Page 12: System Installation

    Mounting Frame Screw M8*60 expansion bolt Side fastener 80*40*36mm Screw M5*12 Power Cable 1.5m Signal cable RJ45,1.5m SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 12 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 13 Therefore, do not install it outdoors in areas with salt damage. The areas with salt damage are defined as the areas which are not 500m away from shore or will be affected by sea breezes. The areas affected by SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 14: Installation Space Requirements

    200mm away from the ground,the distance between the batteries should be greater than 200-350mm. 5.4 Device Installation 5.4.1 Wall mount 5.4.1.1 Installation Location Selection SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 14 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 15 Drill 6 holes according to the hole position, it is φ8 with depth of 45~50mm.Hammer the M8 screws to the above holes, and screw the nut. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 16 5.4.2.1 Install Expansion Bolts In order to avoid electrical shock or other injury, inspect existing electronic or plumbing installations before drilling holes. DANGER! SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 16 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 17: Electrical Connection

    The operations related to electrical connections must be carried out by professional electrical technicians. When carrying out electrical connections, the operator must wear personal protective articles. CAUTION SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 18: Connecting Grounding Wire

    6.2 Electrical Connection Of One Battery Module 6.2.1 Connecting Grounding Wire Each energy storage battery module shall be connected with the grounding wire provided with the product together. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 19: Connecting Power Cord

    6.2.3 Connecting Signal Line The signal line shall be used to connect RS485-Inverter interface for battery module and inverter. The communication port of the SRNE brand inverter needs to be connected to the RS485-2 interface. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 20 When connecting the inverter, the communication line must be connected and the communication protocol must be consistent. DANGER! The communication cable connected to the SRNE brand inverter is not a standard network cable. If you use a standard network cable, please cut off pins 1 and 2 for connection. NOTICE...
  • Page 21 If there are 2 batteries used in parallel, you need to connect the power cord of each battery. Parallel connection cable of battery modules are optional products. If necessary, please contact your local dealer. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 22 If multiple energy storage battery modules are used in parallel, the address of the energy storage battery module needs to be set. The address should be set as 0~8, and the address of each module cannot be repeated. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 23 Slave3 × Slave4 × Slave5 × Slave6 × Slave7 × Slave8 : off : on SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 23 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 24: System Debugging

    Secondly, turn on the battery switch button and the battery starts to work.If there are multiple modules, please turn on the power switch one by one according to the address sequence. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 25: System Status Indication

    LED blinking description Blinking LED ON LED OFF Blinking1 0.25S 3.75S Blinking2 0.5S 0.5S Blinking3 0.5S 1.5S SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 25 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 26: Capacity Indicator

    Buzzer mute indication(some products do not have this function) Battery heating indication(some products do not have this function) Battery cooling indication(some products do not have this function) SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 27: Warning Notes

    BMS will actively stop charging and discharging. battery output short-circuit Short Circuit Protection protected, stops SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 27 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 28: Detailed Information

    Long key function:press the key for 3 seconds at the same time to reset WiFi,the WiFi symbol will flash. If you can't connect to the network or need to change the network environment, please reset the WiFi. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 29 √ Paceic √ 7.4 WIFI Function 7.4.1 Download App Scan the QR code to download the APP. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 29 of 37 F: +86 0755-27325578...
  • Page 30: Register And Login

    Connecting the device requires turning on Bluetooth, WIFI, and location permissions. 7.4.4 Connect Network Choose WIFI and enter the password,the device starts connecting to the network. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 31: Reset Wifi

    2.4G band of the router is turned on. CAUTION 7.5 Bluetooth Function 7.5.1 Download App Scan the QR code to download the APP. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 31 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 32: Sleep Mode

    Step 4 Turn off the breaker switch between the inverter and battery. Step 5 Turn off button on all storage battery modules, the energy storage is powered off successfully. 8.2 Routine Maintenance SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 33 Check whether the communication interface is incorrectly plugged in and Communication error with inverter Whether the wiring is secure. Whether the battery address is set correctly. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 34 9. Do not touch the battery pack with wet hands. 10. Do not squeeze, drop, or pierce the battery. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 35: Device Cleaning

    9 Product Dimensions and Packaging 9.1 Product Dimensions The external dimensions of the energy storage battery module and power module are 725*480*100mm. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 36: Package Dimensions

    The energy storage battery module is packed in wooden cases with the size of 845*680*1000mm, the number of packs is 5PCS, and the total weight is 350kg. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 37 Grounding Wrie Standard Installation auxiliary board Standard Parallel Power Cable 2(option) option User Manual Standard SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 37 of 37 F: +86 0755-27325578 W: www.srnesolar.com...

Table of Contents