Registered Jack 45 State Of Charge Charge C-rate RS485 RS485 Communication Interface Controller Area Network SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 2 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
Do not touch the product in 5mins after shutdown Comply with RoHS standard The Energy storage system should not be disposed together with the household waste. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
DANGER! weather, such as thunder, rain, snow, and gale level 6. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
● Never place the battery in the fire to avoid explosion and prevent the personal safety from being endangered. ● Do not place the battery module in water or other liquids. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Never install or remove any power cables when the power is on. The electric arcs or sparks may be generated at the moment when the power cable contacts with the conductor, which may cause fire or personal injuries. DANGER! SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
● Do not place any inflammable or explosive items around the device. ● When the device is running, do not block the ventilation vent or heat dissipation system to prevent fire caused by high temperature. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
BMS system, which can be easily expanded and can be combined into 60Kwh battery pack at most. The battery storage can be combined with SRNE brand inverter to form an off-grid photovoltaic system, which can solve the problem of electricity consumption in areas without electricity.
Floor Mount: The battery should be placed in the right position first, and the installation site should be smooth and the wall should be solid, and the distance between the batteries should be greater than 200-350mm. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Drill 12 holes according to the hole position, it is φ8 with depth of 45~50mm.Hammer the M8 screws to the above holes, and screw the nut. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 16
Secure the mounting bracket with 6 screws. 5.4.1.4 Fix Mounting Frame Make the convex side outward and fix the mounting frame to the 12 screws. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 17
Drill 2 holes according to the hole position, it is φ8 with depth of 45~50mm.Hammer the M8 screws to the above holes, and screw the nut. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Cable between AC output and power Cable diameter Prepare by the user AC output line module 10mm /7AWG itself SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 18 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
6.2.2 Connecting Power Cord When connecting the battery wiring, please make sure that the battery switch is off and the indicator light is off. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 20
The signal line shall be used to connect RS485-Inverter interface for battery module and inverter. The communication port of the SRNE brand inverter needs to be connected to the RS485-2 interface. When connecting the inverter, the communication line must be connected and the communication protocol must be consistent.
Page 21
If there are 2 batteries used in parallel, you need to connect the power cord of each battery. Parallel connection cable of battery modules are optional products. If necessary, please contact your local dealer. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 22
If there are multiple batteries, you need to connect the communication line of each battery.Battery and battery connection use RS485-Battery interface, battery and inverter connection need RS485-Inverter interface. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 23
The address should be set as 0~8, and the address of each module cannot be repeated. The address of the battery connected to the inverter must be set as 0. NOTICE SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
All switches connected to the energy storage are in the □Yes □No storage battery module is off "OFF" state. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 24 of 37 F: +86 0755-27325578...
System Status Events POWER OFF Power Off Normal Blinking1 Steady Alarm Blinking1 Blinking3 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 25 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
7.2.4.1 Main Page Value ① Battery temperature ② ③ Charging indication ④ Discharge remain time SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 26 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
Page 27
The battery temperature is higher than the protection Over Temperature Protection value, the BMS will actively stop charging and discharging. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 27 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
Page 28
7.2.4.3 Cell Voltage Page Value ① Battery voltage ② Cell voltage ③ Battery current SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 28 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
7.4.1 Download App Scan the QR code to download the APP. 7.4.2 Register and Login You need to register an account for the first time. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Connecting the device requires turning on Bluetooth, WIFI, and location permissions. 7.4.4 Connect Network Choose WIFI and enter the password,the device starts connecting to the network. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
7.5.1 Download App Scan the QR code to download the APP. 7.5.2 Add Device Connecting the device requires turning on Bluetooth, and location permissions. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
● Check if the unused DC input terminals, energy SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 33 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
Page 34
2. When stacking up the battery packing cases, the stacking requirements on the outer package shall be met. 3. The batteries should be handled with care, and damage to batteries should be strictly prohibited. 4. Requirements for the storage environment: SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 35
As for batteries and long-term storage, routine maintenance is required. Please charge the battery to 40% SOC at a current of 0.2C according to the requirements in the table below. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
The external dimensions of the energy storage battery module and power module are 1013.6*620*190.3mm. 9.2 Package Dimensions The packaging size of a single energy storage battery module is 1120*720*300. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 37
Installation auxiliary board Standard USB communication cable Standard Parallel Power Cable 2(option) option User Manual Standard SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 37 of 37 F: +86 0755-27325578 W: www.srnesolar.com...
Need help?
Do you have a question about the SR-EOS10B and is the answer not in the manual?
Questions and answers