Srne SR-EOV Series User Manual

Vertical energy storage system

Advertisement

Quick Links

SRNE Solar Co., Ltd.
4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China
SR-EOV Series
Vertical Energy Storage System
User Manual
(Gen2)
V1.6
T: +86 0755-26458295
F: +86 0755-27325578
File version: V1.6
E: master@szshuori.com
Page 1 of 59
W: www.srnesolar.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SR-EOV Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Srne SR-EOV Series

  • Page 1 File version: V1.6 SR-EOV Series Vertical Energy Storage System User Manual (Gen2) V1.6 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 1 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 2: Range Of Application

    If you have any suggestions during the use, please do not hesitate to give us feedback. 1.1 Range of Application The installation and user manual of SR-EOV series is applicable to the installation and use of the following products:...
  • Page 3: Safety Precautions

    Do not touch the product in 5mins after shutdown Comply with RoHS standard The Energy storage system should not be disposed together with the household waste. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 4: General Safety

    DANGER! weather, such as thunder, rain, snow, and gale level 6. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 5: Personnel Safety

    ● Never place the battery in the fire to avoid explosion and prevent the personal safety from being endangered. ● Do not place the battery module in water or other liquids. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 6: Personnel Requirements

    Never install or remove any power cables when the power is on. The electric arcs or sparks may be generated at the moment when the power cable contacts with the conductor, which may cause fire or personal injuries. DANGER! SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 7: Grounding Requirements

    ● Do not place any inflammable or explosive items around the device. ● When the device is running, do not block the ventilation vent or heat dissipation system to prevent fire caused by high temperature. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 8: Product Introduction

    SPWM technology, outputs pure sine wave, converts direct current into alternating current, and is applicable for household appliances, power tools and other AC loads. The typical topological diagram for application of the system is as follows: SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 9: System Specifications

    5500W SR-EOV20S-220 20.48kWh 5000W 230Vac 50Hz 0~100A 5500W SR-EOV20S-110 20.48kWh 5000W 120Vac 60Hz 0~100A 5500W SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 9 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 10: Model Coding

    S: Energy storage system 110:American standard ④ Output voltage 220:National standard 3.4 Description of Energy Storage Capacity SR-EOV series energy storage system supports the capacity expansion with up to four energy storage modules. 5KWH 15KWH 20KWH 10KWH SRNE Solar Co., Ltd.
  • Page 11: Appearance Description

    Inverter dimensions(L*W*H):555*130*500mm Battery dimensions(L*W*H):555*130*600mm Base dimensions(L*W*H):635*130*80mm 3.5.2 Power Conversion System Module The power of power conversion system is 5.0KW. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 11 of 59 F: +86 0755-27325578...
  • Page 12 Communication interface definition Number Communication Function Interface Type Picture instruction 7-RS485-A ⑤ RS485-2 Connect battery RJ45 8-RS485-B SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 12 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 13 ⑪ ⑫ Battery Negative Battery Positive (Connect other battery) (Connect other battery) ⑬ Grounding screw SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 13 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 14: Application Scenarios

    BMS system, which can be easily expanded and can be combined into 20Kwh battery pack at most. The battery storage can be combined with SRNE brand inverter to form an off-grid photovoltaic system, which can solve the problem of electricity consumption in areas without electricity.
  • Page 15 At night, the battery supplies power to the loads through the power module. 4.1.3 Complete Application Scenarios During the day, the mains and photovoltaic simultaneously charge the battery and supply power to the loads. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 16 At night, the mains supplies power to the loads, and continues to charge the battery, if the battery is not fully charged. If the mains is disconnected, the battery supplies power to the loads. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 17: System Installation

    If any items are missing or damaged, please contact us. Picture Item Quantity Specification Source Inverter Inverter 5.0kW/48V,110V/220V Package Inverter Base 680*184*80mm Package SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 17 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 18 Package N:Number of batteries 5.2 Preparation of Tools and Meters Types Tools and meters Installation tool SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 18 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 19: Installation Space Requirements

    ● When handling any heavy objects, you should be prepared to bear loads to avoid being crushed or sprained. ● When handling the device by hand, wear protective gloves to avoid injury. 5.3.2 Installation Space Requirements SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 20: Device Installation

    Determine the installation location, please choose a flat ground and a solid wall as the installation location. First, determine the installation position of the base, the fixed size is 648mm. Second, determine the installation position of the battery and inverter. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 21: Mounting The Base

    According to the hole position, drill 2 holes on the ground and 4 holes on the wall, φ8, depth 45~50mm. Tap the M8 screw into the above hole and screw on the nut. 5.4.3 Mounting the base Fasten the base to the expansion screw. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 22 Place the battery on the base, and then tighten the fixing screws on both sides. Install the second battery in the same way. After the installation is complete, install the wall fixing bracket. SRNE Solar Co., Ltd. Page 22 of 59...
  • Page 23: Electrical Connection

    Signal cable between battery Signal line modules or between battery and Battery Package inverter SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 23 of 59 F: +86 0755-27325578...
  • Page 24: Connecting Power Cord

    (positive battery terminal) and the black cable to the black terminal (negative battery terminal). Power Cable SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 25 File version: V1.6 Power Cable ground screw SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 25 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 26 The signal line delivered with the product together shall be used to connect RS485-Battery interface for each battery module. The inverter communication interface connects the 485-BMS and the 485-INV interface of the battery. Signal Cable SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 27: Connecting Ac Input

    According to the cable sequence and terminal position shown in the figure below, correctly connect the AC input line. Please pay attention to L and N and avoid short-circuit when wiring. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 28 According to the cable sequence and terminal position shown in the figure below, correctly connect the PV input cable. When wiring, please pay attention to the positive and negative poles and avoid short-circuit. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 29: Wiring Specifications

    Expand capacity power cable of battery modules are optional products. If necessary, please contact your local dealer. 15kwh Wiring diagram: SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 29 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 30 You can choose to connect 2 sets of battery systems through a parallel power cable. Parallel connection cable of battery modules are optional products. If necessary, please contact your local dealer. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 31 The connection should be correct and the length and diameter of the connection should be the same before the electric startup, so as to avoid the abnormal work of the output of the parallel system caused by the wrong AC IN wiring: SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 32 File version: V1.6 6.5.3 Parallel Communication Line Connection Communication cable and current sharing cable are optional products. If necessary, please contact your local distributor. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 33: System Debugging

    All breaker of the battery All breaker of the battery module are in the "OFF" state. □Yes □No module are off SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 33 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 34 Battery ON/OFF After the power switch is turned on, the LED indicator will light up or flash. The meaning of the LED indicator is as follows. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 35: Capacity Indicator

    7.2.3 Capacity Indicator Capacity indicator LED 0~25% 25~50% 50~75% 75~100% : LED ON :LED OFF SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 35 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 36 PV, AC output and AC input breaker switch. Inverter ON/OFF 7.2.5 Inverter LED And Button Function Description After the power module works normally, the indicator lights are described as follows: SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 37 Load kVA Soft Version PV Rated Voltage Battery Rated Current Reserved Load Rated Power Parallel Mode SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 37 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 38 90~140V AC Input Voltage The input mains voltage range of 230V machine is 90~280V Mains input voltage range of 120V SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 38 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 39 PV1ST initiated only when the PV has failed. Only PV charging, no mains ONLYPV charging is enabled. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 39 of 59 F: +86 0755-27325578...
  • Page 40 [13], with the Set Range of 40V~48V and Step of 0.4V. available when the battery SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 40 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 41 Equalization with the Set Range of 48V~58V, Voltage Step of 0.4V, available for Flooded lead-acid battery, sealed lead-acid SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 41 of 59 F: +86 0755-27325578...
  • Page 42 Restart Enable overload auto restart. If overload occurs, shut down output, delay the machine for 3 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 42 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 43 Range of 0~40A RS485 communication address RS485 Address can be set within the range of Setting 1~254 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 43 of 59 F: +86 0755-27325578...
  • Page 44 1 and the live wire L2 in phase 2 is 230*1.732 = 398Vac, and similarly the line voltage between L1- L3, L2-L3 is 398Vac; the single phase voltage SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 45 52.8V Recovery Point than this Value, the Inverter will resume charging again. And the set range is 44V~54V. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 45 of 59 F: +86 0755-27325578...
  • Page 46 AC1ST, which only enable the SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 46 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 47 Discharge alarm 15% SOC alarm when capacity is less SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 47 of 59 F: +86 0755-27325578...
  • Page 48 Before using this function for the first time, please set the local time in parameter items 54, 55, then the user can set the corresponding time slot according to the local peak and valley tariff charges. CAUTION SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 49 NO-N point is closed while NC-N point is open. At this point, NO-N point can drive resistive loads: 125VAC/1A, 230VAC/1A, 30VDC/1A. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 50: System Maintenance

    Check if the radiator is covered or dirt on a regular Once every six months to one System cleanliness basis. year. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 50 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 51: Troubleshooting

    Inverter overload protection 【15】 AcOverCurrHw Inverter overcurrent hardware protection 【17】 InvShort Inverter short circuit protection SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 51 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 52 Charge the battery until it returns to the low voltage disconnection recovery Battery undervoltage protection voltage. Fan failure Check if the fan is not turning or blocked by foreign object. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 52 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 53 25 ℃), 9 months (25 ℃ to 35 ℃), or 6 months (35 ℃ to 55 ℃), recharging shall be arranged in time. 8. When the stored batteries are going to be delivered, the first-in first-out principle should be followed. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 54: Device Cleaning

    The product shall not be cleaned with organic solvents, corrosive liquids and other cleaning products. If the fan fails, it can be replaced by a professional. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 55: Technical Data

    PV Charging Current Range 100A 100A Charge PV Operating Voltage Range 120~500V 120~500V MPPT Voltage Range 120~450V 120~450V SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 55 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 56 Recommended Operation Environment Indoor Installation Method Vertical Gross Weight 50kg Dimension L× D× H 600×555×130 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 56 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 57: Product Dimensions

    The energy storage battery module and Inverter module are packed in wooden cases with the size of 1120*1400*645mm,the number of packs is 10PCS, and the total weight is 400Kg. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 58: Packaging List

    5.0kW/48V,110V/220V Package Battery Battery 5.12kWh/51.2V Package Inverter Base 680*184*80mm Package Battery Mounting Frame 80*44mm Package SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 58 of 59 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 59 (Optional) Inverter Expand Capacity 1.2m,4AWG Package Power Cable (Optional) Inverter User Manual Package SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 59 of 59 F: +86 0755-27325578 W: www.srnesolar.com...

Table of Contents