File version: V1.1 SR-SE Series Energy Storage Battery User Manual V1.1 SR-SE05B SR-SE10B SR-SE15B SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 1 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
Page 2
If you have any suggestions during the use, please do not hesitate to give us feedback. 1.1 Range of Application The installation and user manual of SR-SE series is applicable to the installation and use of the following products:...
Page 3
Do not touch the product in 5mins after shutdown Comply with RoHS standard The Energy storage system should not be disposed together with the household waste. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 4
● Transportation damage is caused during customer's own transportation. ● The storage condition does not meet the requirements of the product related documents and causes damage. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 5
● Do not place irrelevant items on the top of the device or insert them into any part of the device. ● Do not place flammable items around the device. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 6
● The replacement of device or components (including software) must be carried out by professionals or authorized personnel. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 7
● Do not install or use this product in an environment where the temperature is lower than -10 ℃ or higher than 50 ℃. ● It should be installed in a dry and well-ventilated environment to ensure good heat dissipation performance. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 8
The operation and service life of the energy storage is related to the operating temperature. The energy storage should be installed at a temperature equal to or better than the ambient temperature. CAUTION SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 12
BMS system, which can be easily expanded and can be combined into 45Kwh battery pack at most. The battery storage can be combined with SRNE brand inverter to form an on-grid or off-grid photovoltaic system, which can solve the problem of electricity consumption in areas without electricity.
Page 13
(only for SE10/15B) Mounting Frame Connecting Strip 375*39*12mm (only for SE10/15B) Screw/Wrie PM4*10mm (only for SE10/15B) SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 13 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
Page 14
● The energy storage cannot be installed forwardly, horizontally, inversely, backwardly or sideways. ● When drilling holes on walls or ground, the goggles and protective gloves shall be worn. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 15
Choose suitable firm wall with thickness greater than 80mm. CAUTION The battery pack is very heavy, which requires multiple people to install. CAUTION SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 15 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
Page 16
Align the mounting bracket in the appropriate hole. Hammer the M8 screws into the above holes and screw on the nuts. Hook the battery to the mounted bracket. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 17
5.4.2.2 Fix Mounting Frame Make the convex side outward and fix the mounting frame to the 8 screws. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 18
Signal cable Standard Ground cable Prepare by the between the storage battery user itself modules SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 18 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
Page 19
6.2.3 Connecting Power Cord When connecting the battery wiring, please make sure that the battery switch is off and the indicator light is off. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 20
The signal line shall be used to connect RS485-Inverter interface for battery module and inverter. The communication port of the SRNE brand inverter needs to be connected to the RS485-2 interface. When connecting the inverter, the communication line must be connected and the communication protocol must be consistent.
Page 21
6.3.2 Connecting Power Cord If there are 2 batteries used in parallel, you need to connect the power cord of each battery. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 22
If there are multiple batteries, you need to connect the battery-to-battery connection uses the BAT-OUT connection to the BAT-IN battery interface, battery and inverter connection need RS485-Inverter interface. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 23
Once the batteries are connected to the inverter, power up in the following sequence. Firstly, switch on the circuit breaker switch Second, turn on the battery switch button and the battery starts to work. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 24
Alarm Flash Discharging Over Discharge Protection Over Current,Short Current Communicating Flash(BULE LED) WiFi/Bluetooth No communication SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 24 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
Page 26
7.4.1 Download App Scan the QR code to download the APP. 7.4.2 Add Device Connecting the device requires turning on Bluetooth, and location permissions. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 27
7.5.1 Download App Scan the QR code to download the APP. 7.5.2 Register and Login You need to register an account for the first time. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 28
Connecting the device requires turning on Bluetooth, WIFI, and location permissions. 7.5.4 Connect Network Choose WIFI and enter the password,the device starts connecting to the network. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 29
BMS will turn off LED and WiFi module to save power.If you want to continue using it, please turn the power button on and off again. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 30
Check if the grounding cable is grounded reliably. and testing, and once every six reliability months to one year thereafter. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 30 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
Page 31
– The corrosive organic solvents, gases and other substances shall be kept away. – Exposing to direct sunlight shall be avoided. – The distance from the heat source should not be less than two meters. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 32
SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 33
9 Product Dimensions and Packaging 9.1 Product Dimensions SR-SE05S is 646*396*149.3mm. SR-SE10S is 690*432.5*255.5mm. SR-SE15S is 899.5*432.5*270.3mm. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 33 of 36 F: +86 0755-27325578...
Page 34
A single energy storage battery module,The packaging size of SE05B is 695*470*200mm. A single energy storage battery module,The packaging size of SE10B is 740*535*305mm. A single energy storage battery module,The packaging size of SE15B is 940*450*323mm. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 35
(only for SE10/15B) Mounting Frame Connecting Strip 375*39*12mm (only for SE10/15B) Screw/Wrie PM4*10mm (only for SE10/15B) SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 35 of 36 F: +86 0755-27325578 W: www.srnesolar.com...
Page 36
File version: V1.1 Power Cable Standard Signal cable Standard User Manual Standard SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 36 of 36 F: +86 0755-27325578 W: www.srnesolar.com...