Srne SR-EOH05B User Manual

Energy storagebattery

Advertisement

Quick Links

SR-EOH05B Energy Storage Battery
SRNE Solar Co., Ltd.
4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China
User Manual
V1.0
T: +86 0755-26458295
F: +86 0755-27325578
File version: V1.0
E: master@szshuori.com
Page 1 of 26
W: www.srnesolar.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SR-EOH05B and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Srne SR-EOH05B

  • Page 1 File version: V1.0 SR-EOH05B Energy Storage Battery User Manual V1.0 SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 1 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 2: Range Of Application

    Registered Jack 45 State Of Charge Charge C-rate RS485 RS485 Communication Interface Controller Area Network SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 2 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 3: Safety Precautions

    Do not touch the product in 5mins after shutdown Comply with RoHS standard The Energy storage system should not be disposed together with the household waste. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 4: General Safety

    DANGER! weather, such as thunder, rain, snow, and gale level 6. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 5: Personnel Safety

    ● Never place the battery in the fire to avoid explosion and prevent the personal safety from being endangered. ● Do not place the battery module in water or other liquids. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 6: Personnel Requirements

    Never install or remove any power cables when the power is on. The electric arcs or sparks may be generated at the moment when the power cable contacts with the conductor, which may cause fire or personal injuries. DANGER! SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 7: Grounding Requirements

    ● Do not place any inflammable or explosive items around the device. ● When the device is running, do not block the ventilation vent or heat dissipation system to prevent fire caused by high temperature. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 8: Product Introduction

    Discharging temperature range -10~45℃ Cooling method Natural cooling Enclosure protection rating IP20 Operation Environment Indoor SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 8 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 9: Model Coding

    B: Energy storage battery ③ Product category C: Power conversion module S: Energy storage system 3.3 Appearance Description SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 9 of 26 F: +86 0755-27325578...
  • Page 10: Application Scenarios

    BMS system, which can be easily expanded and can be combined into 20Kwh battery pack at most. The battery storage can be combined with SRNE brand inverter to form an on-grid or off-grid photovoltaic system, which can solve the problem of electricity consumption in areas without electricity.
  • Page 11: System Installation

    Power Cable 1.5m Package Battery Signal cable RJ45,1.5m Package Battery Grounding Wrie Package N:Number of batteries SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 11 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 12 (e.g. typhoons, monsoons) or topographical conditions (dams, hills). ● Do not install in the place where children can touch. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 13: Installation Space Requirements

    Floor Mount: The battery should be placed in the right position first, and the installation site should be smooth and the wall should be solid, and the distance between the batteries should be greater than 300-350mm. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 14: Device Installation

    Place the battery on the base, and then tighten the fixing screws on both sides Install the second battery in the same way,Install mounting brackets on both sides. Follow the above method to install the battery pack you need SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 15: Electrical Connection

    Cable between AC output and power Cable diameter Prepare by the user AC output line module 10mm /7AWG itself SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 15 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 16 (positive battery terminal) and the black cable to the black terminal (negative battery terminal). Power Cable Power Cable SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 17 The signal line delivered with the product together shall be used to connect RS485-Battery interface for each battery module. The communication port of the SRNE brand inverter needs to be connected to the RS485-2 interface. Signal Cable SRNE Solar Co., Ltd.
  • Page 18 × Slave8 × The address of the battery connected to the inverter must be set as 0. NOTICE SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 18 of 26 F: +86 0755-27325578...
  • Page 19: System Debugging

    Secondly, turn on the battery switch button and the battery starts to work.If there are multiple modules, please turn on the power switch one by one according to the address sequence. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 20: System Status Indication

    LED blinking description Blinking LED ON LED OFF Blinking1 0.25S 3.75S Blinking2 0.5S 0.5S Blinking3 0.5S 1.5S SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 20 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 21: Capacity Indicator

    KStar √ √ MEGAREVO √ Afore √ SRNE √ Deye √ Voltronic √ Paceic √ SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 21 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 22: System Maintenance

    Check if the grounding cable is grounded reliably. and testing, and once every six reliability months to one year thereafter. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 22 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 23 – Dry, well ventilated, and clean. – The corrosive organic solvents, gases and other substances shall be kept away. – Exposing to direct sunlight shall be avoided. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 24: Device Cleaning

    SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
  • Page 25: Product Dimensions

    Mounting Frame 80*44mm Package Mounting Frame Battery M8*60 expansion bolt Screw Package Battery Screw M5*10 Package SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 25 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
  • Page 26 Package Battery Power cable 560mm,4AWG Package Battery Signal cable 700mm Package Battery User Manual Package SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 26 of 26 F: +86 0755-27325578 W: www.srnesolar.com...