Registered Jack 45 State Of Charge Charge C-rate RS485 RS485 Communication Interface Controller Area Network SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 2 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
Do not touch the product in 5mins after shutdown Comply with RoHS standard The Energy storage system should not be disposed together with the household waste. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
DANGER! weather, such as thunder, rain, snow, and gale level 6. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
● Never place the battery in the fire to avoid explosion and prevent the personal safety from being endangered. ● Do not place the battery module in water or other liquids. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Never install or remove any power cables when the power is on. The electric arcs or sparks may be generated at the moment when the power cable contacts with the conductor, which may cause fire or personal injuries. DANGER! SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
● Do not place any inflammable or explosive items around the device. ● When the device is running, do not block the ventilation vent or heat dissipation system to prevent fire caused by high temperature. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
BMS system, which can be easily expanded and can be combined into 20Kwh battery pack at most. The battery storage can be combined with SRNE brand inverter to form an on-grid or off-grid photovoltaic system, which can solve the problem of electricity consumption in areas without electricity.
Power Cable 1.5m Package Battery Signal cable RJ45,1.5m Package Battery Grounding Wrie Package N:Number of batteries SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 11 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
Page 12
(e.g. typhoons, monsoons) or topographical conditions (dams, hills). ● Do not install in the place where children can touch. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Floor Mount: The battery should be placed in the right position first, and the installation site should be smooth and the wall should be solid, and the distance between the batteries should be greater than 300-350mm. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Place the battery on the base, and then tighten the fixing screws on both sides Install the second battery in the same way,Install mounting brackets on both sides. Follow the above method to install the battery pack you need SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Cable between AC output and power Cable diameter Prepare by the user AC output line module 10mm /7AWG itself SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 15 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
Page 16
(positive battery terminal) and the black cable to the black terminal (negative battery terminal). Power Cable Power Cable SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Page 17
The signal line delivered with the product together shall be used to connect RS485-Battery interface for each battery module. The communication port of the SRNE brand inverter needs to be connected to the RS485-2 interface. Signal Cable SRNE Solar Co., Ltd.
Page 18
× Slave8 × The address of the battery connected to the inverter must be set as 0. NOTICE SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 18 of 26 F: +86 0755-27325578...
Secondly, turn on the battery switch button and the battery starts to work.If there are multiple modules, please turn on the power switch one by one according to the address sequence. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Check if the grounding cable is grounded reliably. and testing, and once every six reliability months to one year thereafter. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com Page 22 of 26 F: +86 0755-27325578 W: www.srnesolar.com...
Page 23
– Dry, well ventilated, and clean. – The corrosive organic solvents, gases and other substances shall be kept away. – Exposing to direct sunlight shall be avoided. SRNE Solar Co., Ltd. 4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China T: +86 0755-26458295 E: master@szshuori.com...
Need help?
Do you have a question about the SR-EOH05B and is the answer not in the manual?
Questions and answers