Advertisement

Quick Links

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VersiCharge 8EM1393-2 A11 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Siemens VersiCharge 8EM1393-2 A11 Series

  • Page 2 VersiCharge™ Dual EV Charging Station | Installation and Operations Manual Introduction Safety Instructions Tools and Materials Installation Instructions VersiCharge™ Dual EV Charging Commissioning Station | Installation and Operations Manual Maintenance Installation Manual Warranty Help! Appendix 04/2025 Rev 00...
  • Page 3 Note the following: WARNING Siemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems.
  • Page 4: Table Of Contents

    Table of contents Introduction ............................4 Safety Instructions ..........................6 Tools and Materials ..........................7 Required Tools for Installation ....................7 Standard Supplied Parts ....................... 7 Installation Instructions ......................... 9 Pedestal and Pedestal Base Dimensions (in inches) ............... 9 Site Preparation and Base Requirements ................10 Pedestal Assembly Installation ...................
  • Page 5: Introduction

    • Personal injury • Material damage • Dangerous situations • Loss of warranty Current offerings: Siemens offers the following VersiCharge™ Dual EV Charging Station variants: Description Catalog number VersiCharge 48A 95” Dual EV Charging Station with retractable cable management 8EM1393-2BA11 VersiCharge 48A 95”...
  • Page 6 The contents of this instruction manual shall not become part of or modify any prior or existing agreement, commitment or relationship. The sales contract contains the entire obligation of Siemens. The warranty contained in the contract between the parties is the sole warranty of Siemens. Any statements contained herein do not create new warranties or modify the existing warranty.
  • Page 7: Safety Instructions

    Safety Instructions DANGER Hazardous voltage Will cause death or serious injury. Disconnect and apply lockout/tagout before working on this equipment. This indicates a situation where the present voltage could cause injury or death. Extreme caution is required when servicing or installing the equipment referenced. DANGER Explosion hazard This equipment has arcing or sparking parts that should not be exposed to flammable...
  • Page 8: Tools And Materials

    Tools and Materials Required Tools for Installation • Tape Measure • Wire Cutters • Wire Strippers (6 AWG-20 AWG) • Ferrule Crimper (18 AWG) • Portable Drill (Hammer Style preferred for concrete anchor installation) • Concrete Drill 5/8” • Level •...
  • Page 9 Tools and Materials 3.2 Standard Supplied Parts Optional Payment Terminal Parts • (1) Payment Terminal • (1) Payment Terminal Mounting Bracket (Discard for this application) • (1) LTE Antenna with Cable • (1) Payment Terminal Installation and Commissioning Manual • (4) Screw, M3 x 0.5mm x 14mm, Button Head, #1 Phillips Drive •...
  • Page 10: Installation Instructions

    Installation Instructions Pedestal and Pedestal Base Dimensions (in inches) Features • Dual mount pedestal • Siemens VersiCharge standard bolt pattern • Aluminum pedestal post • Aluminum pedestal base • Powder coated with primer undercoat for environmental durability • Pedestal doubles as an electrical raceway •...
  • Page 11: Site Preparation And Base Requirements

    All pedestals are factory pre-drilled for installing two (2) Siemens VersiCharge EVSE units. All VCCS will include a bracket for mounting of (2) Siemens VersiCharge EVSEs. This post product is recommended to be used for VersiCharge 40/48 A models that are supplied with 25 ft.
  • Page 12: Pedestal Assembly Installation

    Installation Instructions 4.3 Pedestal Assembly Installation For safety, it’s recommended to leave the ground wire longer than the current carrying wires (L1/L2). Feed-wire size shall be determined by a qualified electrician using industry standard calculations. Note Communications wires must be shielded and suitable to be run by power wires or the power wires may cause interference.
  • Page 13 Installation Instructions 4.3 Pedestal Assembly Installation 6. Repeat steps 3-5 for locations B, C & D respectively. 7. Level the unit in all directions, use shims if needed. Torque Anchor Bolts to 20 ft-lbs. – If the conduit is above ground, remove any hole plug(s) and connect the conduits to the lower 1”...
  • Page 14: Cable Retractor Assembly And Mounting Bracket Installation

    Installation Instructions 4.4 Cable Retractor Assembly and Mounting Bracket Installation Cable Retractor Assembly and Mounting Bracket Installation 1. Cut the marked ropes on the Retractor Assembly which secure the counterweights during transportation. 2. Align the Retractor Assembly with the Pedestal Base Plate and mount (2) Screw, 1/4-20 x 3/4"...
  • Page 15 Installation Instructions 4.4 Cable Retractor Assembly and Mounting Bracket Installation 5. Remove the Front Panel from the Dual Mounting Bracket and the Front Panel from the Pedestal Base Assembly using 5/32” Tamper Resistant Allen Wrench from EVSE Kit to remove the (11) Screws, #10-32 X 1/2", Button Head, Security Pin, 5/32” Hex (Allen) Drive and set aside to reinstall later.
  • Page 16: Evse Installation

    Installation Instructions 4.5 EVSE Installation EVSE Installation 1. Remove all the components from the EVSE packaging and set aside. 2. Retrieve the EVSE Mounting Bracket. Use (4) Screw, #10-32 X 1/2", Button Head, Security Pin, 5/32” Hex (Allen) Drive to attach the Dual Mounting Bracket as shown in the figure below.
  • Page 17 This product can be either used with static derating (EVSE have fixed set current output) or dynamic load management. Dynamic load management requires a UL 60730-1 listed OCPP backend, such as Siemens’ DepotFinity (https://www.siemens.com/global/en/products/energy/emobility/depotfinity.html). 4. Use the following tables and Load Management requirements to determine amperage switch setting.
  • Page 18: Payment Terminal Installation (Optional)

    Installation Instructions 4.6 Payment Terminal Installation (optional) 5. Install the VersiCharge using the Quick Start Guide (https://assets.new.siemens.com/siemens/assets/api/uuid:34c74ebc-cd95-4f77-9e63- 1775ef903d3a/SIE-T40016-00-4AUS-VersiCharge-Quick-Start-Guide-New- Enclosure_original.pdf) provided with the EVSE, following steps 2-13. 6. In Step 12 use (1) Screw, #10-32 X 1/2", Button Head, Security Pin, 5/32” Hex (Allen) Drive from Post hardware kit to fasten Holster from EVSE to the Dual Mounting Bracket and tighten using 5/32”...
  • Page 19 Installation Instructions 4.6 Payment Terminal Installation (optional) 4. Place the AC Power Adapter centered on the shelf of Mounting Bracket and secure it using the supplied Zip Tie, 8" through the center section of the Mounting Bracket. Figure 4-9 Place the AC Power Adapter Note Ensure the power adapter is securely fastened to the mounting bracket.
  • Page 20 Installation Instructions 4.6 Payment Terminal Installation (optional) 6. Route wire stripped end of the AC Cable from Step 3 through the punched hole in multi entry gland. Ensure the cable goes down and makes a U-bend up before entering the terminal blocks in Pedestal Base Raceway.
  • Page 21 Installation Instructions 4.6 Payment Terminal Installation (optional) 8. Remove the back cover from the Payment Terminal, insert the SIM card in slot #2 and replace the cover. – Do not insert sim card into slot #1. – Pay attention to correct orientation of the SIM in slot #2. ①...
  • Page 22 Installation Instructions 4.6 Payment Terminal Installation (optional) 9. Retrieve the Front Panel and align the Payment Terminal over the (4) hole around the stamped opening and inspect that the silicone gasket is flush to Front Panel to ensure watertight seal. (Note countersink is the front of the Panel). Insert (4) Screw, M3 x 0.5mm x 14mm, Button Head, #1 Phillips Drive from the back side of the Front Panel into the payment terminal and fasten using #1 Phillips Screwdriver and tighten.
  • Page 23 Installation Instructions 4.6 Payment Terminal Installation (optional) 12. Insert Black wire to L1, Red wire to L2 and Green wire to GND as shown in figure below. (Check for continuity) Figure 4-15 Wire the Payment Terminal to Terminal Blocks 13. Roll up the remaining wire in the mounting bracket and tie them to the mounting bracket using the provided zip tie.
  • Page 24 Installation Instructions 4.6 Payment Terminal Installation (optional) 14. Insert the (20) Pin Connector from the AC Power Adapter into the Payment Terminal (MDB/COM Port). 15. Attach Antenna Cable to Input labeled MAIN. Figure 4-17 Payment Terminal Connection Ports 16. Reattach the Front Panel from the Dual Mounting Bracket using 5/32” Tamper Resistant Allen Wrench from EVSE Kit to install the (5) Screws, #10-32 X 1/2", Button Head, Security Pin, 5/32”...
  • Page 25: Set Up The Cable Retraction System

    Installation Instructions 4.7 Set Up the Cable Retraction System Set Up the Cable Retraction System ① Cable unwound ② Charging cable midway point ③ Cable hovers above ground Figure 4-18 Attaching the Cable Clamp to Charging Cable 1. Ensure the charging station is properly installed to pedestal/retractor system. 2.
  • Page 26: Finalize The Installation

    Installation Instructions 4.8 Finalize the Installation 5. Slide the cable positioning until you’ve achieved a loop from: – Charging station to the clamp – Clamp to the charging station connector – Both loops should hover above the ground ③ 6. Tighten the screws, the cable should not move within the clamp. If needed, electrical tape can be used to create a tighter grip between the cable clamp and cable.
  • Page 27 Installation Instructions 4.8 Finalize the Installation – Use the figure below "Line Wiring Diagram for Dual Input" to connect EVSE 2. Connect L1 to L1(C2), L2 to L2(C2), GND to GND(C2) to the lower section of the Terminal Blocks using Small Flat Screwdriver to release spring loaded lock. Insert the wire until fully seated into Terminal Blocks (No Copper Visible) Figure 4-19 Line Wiring Diagram for Dual Input...
  • Page 28 Installation Instructions 4.8 Finalize the Installation Figure 4-20 Line Wiring Diagram for Single Input 3. Choose the installed Amperage/Voltage Label from the Adjusted Amperage Rating Label Set and place it in the box provided on the Product Label located to the right side of the Pedestal Assembly.
  • Page 29 Installation Instructions 4.8 Finalize the Installation 5. Reattach the Front Panel from the Pedestal Base Assembly using 5/32” Tamper Resistant Allen Wrench from EVSE Kit to install the (6) Screws, #10-32 X 1/2", Button Head, Security Pin, 5/32” Hex (Allen) Drive and tighten. Figure 4-22 Reattach the Front Panel 6.
  • Page 30: Commissioning

    (https://play.google.com/store/apps/details?id=com.siemens.VersiChargeSG) or the Apple App Store (https://apps.apple.com/us/app/sifinity-go/id989742892) on your mobile device. 2. Follow the instructions in the Installation and Operations Manual (https://support.industry.siemens.com/cs/ww/en/view/109977709) to commission the EVSEs using Sifnity Setup. Commissioning Payment Terminal 1. Follow the commissioning guide for the payment terminal to commission the payment terminal and add chargers to the payment terminal.
  • Page 31: Maintenance

    Maintenance WARNING Electric shock due to water ingress Water entering the VersiCharge Dual EV Charging Station can damage the charging station and introduce dangerous voltages to exposed components, which can cause serious injury or death if touched Never use a pressure washer, steam jet, or water jet when cleaning the charging station. WARNING Damage to property due to improper cleaning agents Improper cleaning agents can damage the payment terminal of the VersiCharge charging...
  • Page 32: General External Checks

    – Snow accumulation around the unit should be checked and cleared daily. In areas with especially heavy snowfall, this should be performed more often. If damage is observed, contact your supplier or Siemens directly by creating a support ticket as described in the Help! section (Page 33).
  • Page 33: Warranty

    LEGAL NOTICE: Use of this product indicates acceptance of these terms and non-compliance may void the warranty. Please access the product warranties at the following links: Product Warranties • VersiCharge™ - Applies to all VersiCharge™ (https://assets.new.siemens.com/siemens/assets/api/uuid:aa957eb2-0e18-4983-a559- 6c9a30851e1d/SIE-B40053-00-4AUS-VersiCharge-AC-Limited-Warranty.pdf) Accessories Warranties • VersiCharge™ Accessories - Applies to all VersiCharge™ accessories (https://assets.new.siemens.com/siemens/assets/api/uuid:90a9692a-5992-4b03-bea5- fa30f63f324c/SIE-B40059-00-4AUS-VersiCharge-AC-Accessories-Limited- Warranty_original.pdf)
  • Page 34: Help

    Help! Call us any time, any day, at +1 (855) 950-6339, option 9, or contact us via support ticket at (https://emobility.usa.siemens.com/s/eMobilityCloud). VersiCharge™ Dual EV Charging Station | Installation and Operations Manual Installation Manual, 04/2025, Rev 00...
  • Page 35: Appendix

    Appendix Dimensions dual post (in inches) Figure A-1 Dual Posting Mounting Dimensions VersiCharge™ Dual EV Charging Station | Installation and Operations Manual Installation Manual, 04/2025, Rev 00...

This manual is also suitable for:

Versicharge 8em1393-2ba11Versicharge 8em1393-2ca11

Table of Contents