Contents 1. General recommendations regarding safety, use and prohibitions ........... 4 2. Components .................................5 3. Parts lists and sections ............................6 3.1 Zeus Pro parts list ....................................6 4. Main technical data ..............................7 4.1 Maximum assembly dimensions ..............................7 4.2 Restrictions based on current regulations ..........................7 4.3 Packaging discounts ..................................9 5.
1. General recommendations regarding safety. Use and restrictions In order to ensure the safe assembly, use and maintenance of Before assembly, it is very IMPORTANT for your safety and that this product, a number of precautionary measures must be taken. of the product to follow all the recommendations listed below.
3. Parts lists and sections 3.1 Zeus Pro part list Components Code Description Code Description Zeus Visor Profile Zeus Roller Profile 120439 120448 Rolling Tube Ø85 Zeus Anti-friction strip 022325 120449 Box Profile Zeus Load profile Zeus 120442 120450 Kit Accessories Box Zeus Kit support foot 120452 120438...
TECHNICAL MANUAL ZEUS 4. Main technical data 4.1 Maximum assembly dimensions 2 guides 3 guides Maximum line 7m (all with tension) Maximum output. 6m, 5m for lines longer than 6m. Pro Air 2 guides 3 guides 7m (all with tension). The front goal structure of this system, Maximum line for sizes 5 to 7m out, shall have...
Page 8
Size of the rolling tube 85mm iron rolling tube. Tilt range - From 0º to 30º. Drive Motorised (motor 80Nm minimum) Minimum torque of the motor depending on the rolling tube, line and output Further information For installation on legs, the recommended spacing between legs is 1 to 1.2 metres. For Pro Air installation, it is recommended that the front goal be made with 125x125 profiles and their connecting pieces.
TECHNICAL MANUAL ZEUS 4.3 Packaging discounts Cutting dimensions of profiles Motor with support Rolling tube (TE) LT - 11.5 cm Profile tarpaulin (PL) and Visor (PV) LT - 2.4 cm Load profile (PC) LT - 4.5 cm Guide profile (x) without the front cap Exit - 17.5 cm L.
Main measurements PRO assembly Main dimensions PRO AIR 30º assembly Main dimensions of the wall plate and the cardan shaft support for the leg Dimensions in mm...
TECHNICAL MANUAL ZEUS 5. Confection 5.1 Cutting of the box profiles The profiles and the rolling tube shall be cut to the lengths given in the table on page 9. Important For the box to function correctly, the profiles must be cut on both sides, the dimensions must be as indicated above and the cut must be perpendicular to the profiles.
Page 12
Next, we will fix to the motor the coupling by means of which it will be later fixed to the box cover, as well as the coupling in which the end cap located at the other end of the winding will be supported to the opposite cover. DIN 912 M6X16 DIN 125 M8 DIN 912 M8X16...
Page 13
TECHNICAL MANUAL ZEUS We will fix the other cap (with the previously mounted coupling) on the other end of the canvas profile. The cap must be inserted through the plastic cap and the plastic cap into the steel coupling, as shown in the following picture. DIN 7982 4,2X38 Before assembling the visor profile to the tarpaulin profile, the end caps shall be fitted to the tarpaulin.
Once fitted, the visor is fixed to the cover with screws DIN 7982 4.2x38 and the cover at the other end is fixed by tightening all the screws. DIN 7982 4,2X38 DIN 7982 4,2X38 5.3 Cutting the guides The cutting length of the guide rails (C) shall be made on the opposite side (marked as A in the attached picture) to the side on which the tensioning system is mounted.
TECHNICAL MANUAL ZEUS 6. Pro mounting (on structure) 6.1 Mounting of the guides on the structure The leg plates are fixed to the structure on which the awning is to be installed. Next, we place the guide on these plates, joining them to the plates previously mounted on the guides.
7. Pro Air mounting (cantilever) 7.1 Installation of wall plates The wall plates shall be anchored to the wall respecting the dis- Minimum: LT-500 tance between the two given below. Both plates must be at the same distance from the end of the box and it is very important for the correct operation of the box that both the lower and rear faces of the wall plates are flush with each other.
TECHNICAL MANUAL ZEUS 7.4 Assembly of the guides Once the front gantry has been installed, the guides will be moun- ted on it, joining them in turn to the already hung box. First of all, the cardan plates (half of the anchorage) will be atta- ched to the structure.
Once we have the structure installed, we will carry out a fine me- asurement and a correct adjustment of the 2 parallel distances at the ends of the awning (green), and of the 2 main diagonals of the system (red), for its correct operation, according to the attached diagram.
TECHNICAL MANUAL ZEUS Finally, the load profile is connected to the runners by means of a DIN 912 M8x16 screw and the Zeus clamp previously inserted into the load profile. Orifice to be used DIN 912 M8X16 DIN 125 M8 9.
10. Maintenance 10.1 Cleaning and care To clean the canvas, we recommend removing the dust that has For best use and extended durability of the screen, it is recom- accumulated without using water, to enable you to remove all the mended to carry out regular maintenance and checks at least surface particles by vacuuming, air blowing, beating or brushing.
TECHNICAL MANUAL ZEUS Annex I Disassembly and disposal of packaging and end-of-life product components. Packaging Disposal Important The recycling of the packaging must be carried out by the qualified professional who has installed the product. We advise you to recycle the product packaging responsibly: Paper and cardboard: In waste management, the recycling of paper and cardboard •...
Page 22
Attention Always act with care. Please only use suitable tools that are in perfect condition. •Step 10 •Step 1 Loosen and remove the screws that fix the motor/tip covers to the Remove the covers from the box. box. Detach the end caps and end bushings from the box. •Step 2 •Step 11 Attach the safety straps to the arms, which are almost closed (just...
Page 23
TECHNICAL MANUAL ZEUS Components • Profiles • Screws • Axle • Testeros • • Motor • Supports • • Arms set • End caps • Canvas Our products are mainly made of recyclable materials. It is Important advisable to be informed about the recycling or disposal systems provided for under the current regulations in your country for this product category.
Page 24
The materials that make up our products offer a wide range of envi- ronmental benefits Galvanised steel Galvanised steel is a type of steel which undergoes a certain treatment, at the end of which it is coated with several layers of zinc which protect it, avoiding oxidation. Recycling zinc helps reduce demand for new materials and, as a result, generates considerable energy savings, as it is a metal that constitutes a very valuable and sustainable resource.
Page 25
TECHNICAL MANUAL ZEUS Plastic Plastic recycling provides a sustainable source of raw material for the industry. Its reuse also significantly reduces environmental problems, as it is a non-biodegradable material. HDPE Recycling reduces energy consumption and CO2 emissions, thus mitigating pollution and climate change. There are several types of plastic, so to achieve optimal recycling it is essential to deposit them in clean points where the separation of the different types and their identification will take place.
Page 26
Giménez Ganga, S.L.U. Polígono Industrial El Castillo C/ Roma, 4 • 03630 Sax (Alicante) • España saxun.com...
Need help?
Do you have a question about the Saxun Zeus and is the answer not in the manual?
Questions and answers