Page 2
SNR-S2982G-24T-POE Quick Install Guide Quick Install Guide This guide describes the steps of installing the switch, including the basic introduction to the product, the basic installation steps, etc. 1. Front and back panels description Description № Item RJ45 10/100/1000BaseT PoE 802.3af/at ports...
Page 3
SNR-S2982G-24T-POE Quick Install Guide 2. Switch installation Before installation, take ECD-preventive measures, such as wearing the ESD- preventive gloves or a wrist strap. 2.1 Install the Device in a 19” Cabinet Fix the Rack Mount Brackets. Fix the captive nuts, and install the device in a cabinet. Attention: leave more than 1U space between the devices for proper heat dissipation.
Page 4
SNR-S2982G-24T-POE Quick Install Guide 3. Access to initial switch configuration 3.1 Access to the switch via console Connect console cable to switch via RJ-45 connector and another side to RS-232 port of the PC. Settings of the COM-port are below.
Need help?
Do you have a question about the SNR-S2982G-24T-POE and is the answer not in the manual?
Questions and answers