Page 1
Online Support If you require assistance or are experiencing issues with your Spirit Machine, please contact customer care for additional help. 1-800-258-8511 questions@spiritfitness.com EXTENDED XTHRAILS HANDRAILS...
Page 3
Table of Contents Parts Included ..............3 Assembly ................4 Parts List ................6...
PARTS INCLUDED TOOLS INCLUDED: Combination M5 Allen Wrench & Phillips Head Screwdriver Button Head Socket Bolt (14pcs) PARTS INCLUDED: #9. 5/16"×3/4" Button 2 Handgrip Stabilizers #10. M5_ Combination M5 Allen Wrench Head Socket Bolt (14 pcs) 2 Handgrip Connecting Tubes &...
Page 5
ASSEMBLY - STEP ONE TO UNFOLD THE TREADMILL le process Press the tube with your foot at the yellow sticker To release latch.See picture to the right. Set your treadmill into the folded position. TO FOLD THE TREADMILL Lift the deck until the latch in place. Lift the deck until the latch clicks in place.
Page 6
ASSEMBLY - CONTINUED Install the Handgrip Stabilizers (003) into U-shaped Stabilizer Base (004) using 4 pcs of 5/16” × 3/4” Button Head Socket Bolts (009) securing with the M5 L Allen Wrench (010). Insert the Left Handgrip Connecting Tube (001) and Right Handgrip Connecting Tube (002) into the Handgrip Base (009) of the Unit and use the M5 L Allen Wrench (010) to tighten 6 pcs of 5/16”...
PARTS LIST Left Handgrip Connecting Tube Right Handgrip Connecting Tube Handgrip Stabilizer Stabilizer PVC Handgrip (L) PVC Handgrip (R) Rubber Foot Pad Square End Cap 5/16" × 3/4"_Button Head Socket Bolt M5_Allen Wrench Head Screw Wrench M10 x 5T Nut Version: 1.0 Revision: 03/17/23...
Need help?
Do you have a question about the XTHRAILS and is the answer not in the manual?
Questions and answers