Download Print this page

Advertisement

Quick Links

Steel Gazebo
Assembl
We are forever grateful and appreciative of you considering
purchasing our product. After careful evaluation of our product
serie, we are excited to launch this product to the public as it is
more technically advanced with lots of exciting and useful
features. One of the great features added to the arsenal is its
mere size, which will require 3-4 people with about 4-5 hours of
installing time. Making it a beast at its finest!
y Instruction
OB-HTG012(DA007)

Advertisement

loading
Need help?

Need help?

Do you have a question about the OB-HTG012 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Dancover OB-HTG012

  • Page 1 Steel Gazebo Assembl y Instruction OB-HTG012(DA007) We are forever grateful and appreciative of you considering purchasing our product. After careful evaluation of our product serie, we are excited to launch this product to the public as it is more technically advanced with lots of exciting and useful features.
  • Page 2 Steel Gazebo Assembly Instruction M6*10 M6*42 M6*47 5*12 M6*25 M6*15 M6*50...
  • Page 3 step1 STEP 1:Attach Foot Base ( Part L) to the Pillars (Part A) step2 You can put Part A down lf the screw hole is out of alignment, pull adjusting part C or C1 STEP 2:Attach Crossbeams 1 (Part C) and Crossbeams 4 (Part C1) to Pillars (Part A).
  • Page 4 step3 STEP 3:Connect the Crossbeams C and C1 using Crossbeam Connector (Part P) Note: After sliding the Crossbeam Connector (Part P) into a crossbeam you should start one bolt to hold the Crossbeam Connector in place. step4 Step 4: Stand both sides Upright and Connect Crossbeams C and Crossbeams C1 using the Crossbeam Connectors (Part P).
  • Page 5 step5-1 STEP 5-1: Attach the Corner Protectors (Part J1) and the Rib Supports (Part J2) Just twist the top two screws of (Part J2) step5-2 STEP 5-2: Slide 4 Netting Hooks (Part Q) into Crossbeams (Parts C and C1). Then Attach (Part M6) Note: There are two tracks.
  • Page 6 step6 STEP 6:Assemble the Roof Frame by Attaching the Roof Ribs Long (Part E) to the Roof Top Brace (Part K1).
  • Page 7 step7 STEP 7:Lift the Partially assembled Roof on to the assembled Frame and attach. STEP 8:Attach the Roof Ribs Short (Part D) to the Roof Top Brace step8 (Part K1). Attached the Roof Ribs Short (Part D) to the assembled frame.
  • Page 8 step9 STEP 9:Attach the Roof Supports 1 (Part I) to the roof frame using Connectors 1 (Part M3) and Connectors 2 (Part M4). Don't tighten all the screws, just hold the (Part I), until all of them are fixed Please note that Parts M3 are installed on Parts D, and Parts M4 are on...
  • Page 9 step11 If the screw hole is out of alignment, insert it with a screwdriver and correct it Step 11: Install the Roof Plates Part O1 O2 O3 O4 on the Gazebo. Start by sliding Roof Plate1 (Part O2 and O3) into position. Then O1and O4. The same for the other three sides.
  • Page 10 step13 STEP 13:Install the Mosquito Netting as Shown in the Diagram...

This manual is also suitable for:

Da007