Hoymiles LB-5D-G2 Quick Installation Manual

Low voltage battery
Hide thumbs Also See for LB-5D-G2:

Advertisement

Quick Links

Open Energy for All
Low Voltage Battery
Quick Installation Guide
LB-5D-G2
Region: Global REV1.2
hoymiles.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LB-5D-G2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Hoymiles LB-5D-G2

  • Page 1 Open Energy for All Low Voltage Battery Quick Installation Guide LB-5D-G2 Region: Global REV1.2 hoymiles.com...
  • Page 2: Product Overview

    Low Voltage Battery Quick Installation Guide 1 General Declaration • Read this quick installation guide carefully before installation to learn about product features and safety precautions. • Only qualified personnel are allowed to install, operate, and maintain the equipment. • Installers should be familiar with local laws and regulations. •...
  • Page 3: Packing List

    Ground Cable*1 Battery Connector (-)*1 Communication Cable*2 Expansion Screw M8*80*6 Wall Mounting 10 kWh 10 kWh 10 kWh 10 kWh 5 kWh 5 kWh M5 Screw*14*7 Certificate*1 Positioning cardboard*1 Quick Installation Guide*1 © 2024 Hoymiles Power Electronics Inc. All rights reserved.
  • Page 4: Installation Instruction

    Low Voltage Battery Quick Installation Guide 4 Installation Instruction Environmental Requirements 1. The recommended ambient temperature is between 15℃ and 35℃. 2. The recommended relative humidity is between 10% and 95%, without condensing. 3. The altitude should be no more than 2000 m. 4.
  • Page 5: Installation Steps

    Φ: 12 mm 90° 65 mm Step 3 Installing Bracket L and Bracket R 1. Hammer the M8 expansion screws into the hole according to the quantities you need and unscrew the screws. © 2024 Hoymiles Power Electronics Inc. All rights reserved.
  • Page 6 Low Voltage Battery Quick Installation Guide 2. Place the bracket L according to the bottom 4 holes. 3. Use M8 expansion screws to fix the bracket L on the wall with a torque of 15 N·m. 4. The method to install bracket R is the same as that of bracket L. 15 N·m Step 4 Placing the Battery 1.
  • Page 7: Step 6 Completing The Installation

    1. Use M5 screws to fix the bracket A on the top left and top right of the battery. 2. Use M8 expansion screws to fix the bracket A on the wall. 5 N·m 15 N·m © 2024 Hoymiles Power Electronics Inc. All rights reserved.
  • Page 8: Floor Standing

    Low Voltage Battery Quick Installation Guide Floor Standing Step 1 Drilling Holes As described in the wall mounting steps, according to the actual installation, place the positioning paper (Floor Standing Side) against the wall, mark hole position (for bracket A), drill holes, and hammer the sleeves into the holes.
  • Page 9 1. Use M5 screws to fix the bracket A on the top left and top right of the battery. 2. Use M8 expansion screws to fix the bracket A on the wall. 5 N·m 15 N·m © 2024 Hoymiles Power Electronics Inc. All rights reserved.
  • Page 10: Electrical Connection

    Low Voltage Battery Quick Installation Guide 5 Electrical Connection NOTICE • Before the electrical connection, ensure that all power supplies are disconnected. • It is recommended that a circuit breaker between the inverter and the battery be installed in accordance with local laws and regulations.
  • Page 11 ≤ 6 kW) 1. LB-5D-G2 series supports up to 16 batteries in parallel. 2. When the power of the inverter is less than or equal to 6 kW, batteries can be connected directly to it without a busbar, and the maximum charging or discharging current of the battery system is 100 A. If the current exceeds 100 A, it may cause a risk of fire accident.
  • Page 12 Low Voltage Battery Quick Installation Guide Parallel Connection with Busbar (Inverter Power > 6 kW) 1. LB-5D-G2 series supports up to 16 batteries in parallel. 2. When the power of inverter exceeds 6 kW, batteries must be connected to it through a busbar.
  • Page 13 • If needed, the cable ends connected to the inverter should be assembled using battery connectors provided by the inverter manufacturer. • The method of assembling the battery connectors and power cables for parallel connection is shown as follows. 12 mm-14 mm Threading Stripping Crimping Tightening © 2024 Hoymiles Power Electronics Inc. All rights reserved.
  • Page 14: System Power-On

    2. Turn on the power switch and long press the “RESETˮ button for 3s. The battery will be in self-check state and all indicators will flash blue (0.5s gap). Note: • If the battery works with Hoymiles inverters, leave the DIP Switch as default. • If the battery works with non-Hoymiles inverters, please contact Hoymiles. COM IN...
  • Page 15: Led Indicators

    The battery is turned off. 7 EU Declaration of Conformity Hoymiles Power Electronics Inc. hereby declares that Hoymiles Battery (model: LB-5D-G2) is in compliance with the essential requirements and other relevant provisions of directives 2014/30/EU, 2014/35/EU, 2011/65/EU, (EU)2015/863, and EU Battery Regulation (EU)2023/1542.
  • Page 16 User Manual in the QR code or at www.hoymiles.com/resources/download/ Hoymiles Power Electronics Inc. Add: Floor 6-10, Building 5, 99 Housheng Road, Gongshu District, Hangzhou 310015, P . R. China Tel: +86 571 2805 6101 Email: service@hoymiles.com support@hoymiles.com AP041018 www.hoymiles.com...

Table of Contents