Advertisement

Quick Links

Piping and Cabling Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the JuicePump and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Enel X JuicePump

  • Page 1 Piping and Cabling Manual...
  • Page 2: Table Of Contents

    TRI125.INS.016 version 3 29 April 2021 Contents Overview ..........................3 Overview of conduits for JuicePump 175-S system ............3 Conduit requirements ......................4 Cabling requirements ......................5 Conduit A – Worldwide 400V 50Hz ..................5 Conduit A – USA 480V 60Hz / Canada 480V 60Hz ..............6 Conduit A –...
  • Page 3: Overview

    TRI125.INS.016 version 3 29 April 2021 Overview This document defines the cabling and piping of the JuicePump 175-S system. It serves as an aid to install the infrastructure required to put the JuicePump 175-S system into operation. This document describes the minimum requirements.
  • Page 4: Conduit Requirements

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Conduit requirements Termination above ground [mm] Diameter Conduit From - To Sub Conduit Quantity Comments [mm] From side To side Power unit – LV Distribution Board Note 1.
  • Page 5: Cabling Requirements

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Cabling requirements Important Cabling requirements are specified for USA, Canada, and Worldwide. Ensure that you use the correct cabling requirements for your location. Conduit A – Worldwide 400V 50Hz Important: This section is for all locations except USA and Canada.
  • Page 6: Conduit A - Usa 480V 60Hz / Canada 480V 60Hz

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Conduit A – USA 480V 60Hz / Canada 480V 60Hz Important: This section is for USA and Canada. All cables are double insulated and must conform with all relevant local regulations 1.
  • Page 7: Conduit A - Canada 600V 60Hz

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Conduit A – Canada 600V 60Hz Important: This section is for Canada only. All cables are double insulated and must conform with all relevant local regulations 1. Marking of AC power cables: “Lyz”, where:...
  • Page 8: Conduit B - Worldwide

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Conduit B – Worldwide Important: This section is for all locations except USA and Canada. All cables are double insulated and must conform with all relevant local regulations Note: The calculations in this table are based on site conditions as described in the Appendices.
  • Page 9: Conduit B - Usa / Canada

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Conduit B – USA / Canada Important: This section is for USA and Canada. All cables are double insulated and must conform with all relevant local regulations Note: The calculations in this table are based on site conditions as described in the Appendices.
  • Page 10: Remarks

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Remarks The cross section (in mm²) of all conductors in the site is location specific according to relevant local laws and regulations. Verification against these regulations should be performed by the customer prior to installation.
  • Page 11: Appendix: Reference Specifications

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Appendix: Reference specifications STOP! The following information applies to sections 5.1 to 5.5 of the appendix and must be read before you continue. The calculations used in the tables in sections 5.1 to 5.5 are examples based on site conditions that match the values in each of the tables.
  • Page 12: Reference Specification For Ac Link - Worldwide 400Vac

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Reference specification for AC link – Worldwide 400VAC Important: • This section is for all locations except USA and Canada. • The calculations in this document are based on site conditions that match the values in the following table.
  • Page 13: Reference Specification For Ac Link - Usa / Canada 480Vac

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Reference specification for AC link – USA / Canada 480VAC Important: • This section is for USA and Canada. • The calculations in this document are based on site conditions that match the values in the following table.
  • Page 14: Reference Specification For Ac Link - Canada 600Vac

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Reference specification for AC link – Canada 600VAC Important: • This section is for Canada only. • The calculations in this document are based on site conditions that match the values in the following table.
  • Page 15: Reference Specification For Dc Link - Worldwide

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Reference specification for DC link – Worldwide Important: • This section is for all locations except USA and Canada. • The calculations in this document are based on site conditions that match the values in the following table.
  • Page 16: Reference Specification For Dc Link - Usa / Canada

    JuicePump 175-S Piping and Cabling Manual TRI125.INS.016 version 3 29 April 2021 Reference specification for DC link – USA / Canada Important: • This section is for all locations except USA and Canada. • The calculations in this document are based on site conditions that match the values in the following table.

Table of Contents