DCS ADR24 Installation Manual page 9

The professional access drawers
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION
6. Your LP tank will be installed in the recess provided in the bottom of the right compartment (Fig. 14).
7. When connecting the LP tank to the gas line be certain that the gas pipe is routed through the recess provided
on the top of the right side (Fig. 15). Do not route the gas pipe through the opening in the back of the Access
Drawers. Once gas connections are made, test for gas leaks.
8. On models so equipped, install the two (2) racks provided into the opening by sliding them onto the rollers on
the sidewalls of the center cavity (Fig. 16).
Gas Pipe Recess
Tank Receptacle
Fig. 15
Fig. 14
7
Rack & Rack Cover
Drain drawer
Fig. 16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adr30Adr36Adr48

Table of Contents

Save PDF