Download Print this page
Hide thumbs Also See for AEM10941:

Advertisement

Quick Links

AEM10941
Quick Start Guide EVK
FEATURES
Connectors
• 1 screw connector for the photovoltaic cell
• 1 screw connector for the storage element
• 1 screw connector for primary battery
• 1 screw connector for HVOUT LDO output (80mA @ 1.8 – 4.1 V)
• 1 screw connector for LVOUT LDO output (20mA @ 1.2 or 1.8 V)
Configuration
• 2 headers SELMPP[1:0] to define the MPPT ratio linked to the harvester technology
• 3 headers CFG[2:0] to define the storage element protection levels
• 6 resistors footprint related to the custom mode (CFG[2:0] = LLL)
• 2 headers to enable/disable the internal LDOs
• 2 headers to disable the primary battery feature
• 1 headers to set the dual cell supercapacitor BAL feature
Size
• 76mm x 49mm
• 4 x M2.5 Mounting holes
SUPPORT PCB
BOM around the AEM10941
Footprint & Symbol:
Available in the
datasheet
www.e-peas.com
© 2024 e-peas S.A.
QSG-AEM10941_QFN28_EVK2.6-v1.0

Advertisement

loading
Need help?

Need help?

Do you have a question about the AEM10941 and is the answer not in the manual?

Questions and answers

Summary of Contents for E-peas AEM10941

  • Page 1 • 1 headers to set the dual cell supercapacitor BAL feature Size • 76mm x 49mm • 4 x M2.5 Mounting holes SUPPORT PCB BOM around the AEM10941 Footprint & Symbol: Available in the datasheet www.e-peas.com © 2024 e-peas S.A.
  • Page 2 STEP 1: Configure the AEM10941 • MPPT ratio: SELMPP[1:0] • Storage Element voltages protection: CFG[2:0] • BAL option: Select “ToCn” to use the balancing or “GND” to disable it • PRIM option: Connect both headers “NoPRIM” to disable the primary battery feature or remove them if a primary battery is connected.
  • Page 3 STEP 2: Connect the storage element (and the primary battery) STEP 3: Connect the load(s) to HVOUT / LVOUT STEP 4: Connect the harvester Internal Boost efficiency Vs. input voltage (LBOOST = 22 µH) : STEP 5: Check the status www.e-peas.com © 2024 e-peas S.A. QSG-AEM10941_QFN28_EVK2.6-v1.0...