8) Install the ProtoNode on the DIN rail.
a. Install the ProtoNode with the movable rail latch (circled, Figure 14) towards the SOLA
controller
Figure 14
b. Place the movable latch under the rail first (see Figure 15).
Figure 15
Protonode Installation
60T / 100T
Installation Only
SOLA
10