Figure 11
d. Ensure that the mounting template is correctly lined up with the control base prior to drilling
mounting locations (see Figure 11). Removal of the base is not necessary to install DIN Rail.
e. Place the DIN rail over new mounting locations.
Figure 12
f. The DIN rail correctly placed over mounting holes (see Figure 12).
g. Drive down supplied screws to complete the DIN rail mounting (see Figure 13).
Figure 13
60T / 100T
Installation Only
9
Need help?
Do you have a question about the Sierra Monitor ProtoNode FPC N54 Series and is the answer not in the manual?