Summary of Contents for Growatt AXE 30.0-60.0H-CE1 EU
Page 1
AXE 30.0-60.0H-CE1 EU Quick Guide Shenzhen Growatt New Energy Co., Ltd...
Page 2
Installation environment Max.+50℃ RH+5%~+95% Min.-10℃ Installation tools working with M6/M8 bit holders & P2 Phillips bit Lifting trolley Electric screwdriver Manual forklift working with 16 mm drill bit Marker Impact drill Hammer Appearance & dimensions Unit: mm Front view Side view Rear view...
Inspection upon delivery 1- 1 Check the scope of delivery Item Battery cabinet Battery pack Configured based on customer's needs High voltage box Quick Guide User Manual Certificate of Conformity Desiccant 1- 1 Check the accessories List of the installation kit Anchor bracket, screw for fastening the battery and expansion bolt Introduction to the battery cabinet Introduction to the panels of the battery cabinet...
Page 4
Introduction to intra-cabinet components Top routing Bottom routing Position Module Description Battery pack Energy storage device High voltage box Battery charge/discharge control device Introduction to the panel of the high voltage box Position Item Description Connected to the negative power terminal of BAT- power terminal the battery cluster Connected to the positive power terminal of...
Introduction to the panel of the battery pack Position Item Description Negative battery pack Negative battery pack connector terminal Cooling fan For battery heat dissipation Positive battery pack Positive battery pack connector terminal COM1 communication For communication between battery packs, terminal and power supply COM2 communication...
Top view Maintenance access ≥600 ≥200 ≥600 ≥200 Cabinet 1 Cabinet 2 Cabinet 3 Front door Front door Front door ≥1000 Front view Cabinet 1 Cabinet 3 Cabinet 2 1000 above the ground Transportation and installation Drill holes into the ground Mark hole positions at the pre-determined installation location according to the dimensions indicated below.
Page 7
Transport battery cabinet with a forklift Step 1: Remove the decorative panels from the sides of the base for transportation using a forklift and store the panels for reinstallation. Step 2: When moving the equipment with a forklift, secure it appropriately based on the actual situation to avoid tip-overs.
Install the battery cabinet and connect cables Install the battery packs and the high voltage box to the corresponding slots using the lifting trolley. Up to 13 battery packs can be configured. If less than 13 battery packs are configured, please install the 3U panels at the empty positions for battery packs.
Page 9
Step 2: Wiring on the customer side. Take connecting to the WIT30-55K as an example. For a single cabinet, a junction box is required, as shown below: Junction box For multiple cabinets in parallel, a junction box is not required. Up to 3 cabinets can be connected in parallel when working with the WIT30-55K, as shown below: Cable requirements for connecting the battery cabinet and the PCS: 1.
Check before power-on Routine check Checking item Acceptance criteria Ÿ The equipment is intact, free from damage, rust or paint loss. If the paint flakes off, please re-paint the spotted Equipment area. appearance Ÿ Equipment labels are clear and damaged labels should be replaced in time.
Turn off the DC circuit breaker of the high voltage box. Electrical schematic Primary schematic diagram of the energy storage system 9. Service and contact Shenzhen Growatt New Energy Co., Ltd. 4-13/F, Building A, Sino-German (Europe) Industrial Park, Hangcheng Blvd, Bao'an District, Shenzhen, China +86 755 2747 1942 service@ginverter.com...
Need help?