Contents About this Document This document describes the installation, electrical connection, operation, commission, 1 Product Overview maintenance and troubleshooting of AXE 5.0L-C1and AXE 5.0L-X1 Battery System 1.1 Intended Use (hereafter simply put AXE 5.0L). Before installing and operating AXE 5.0L, ensure that 1.2 Appearance you are familiar with product features, functions, and safety precautions provided in this 1.3 Working Principle and Function...
1 Product Overview 1.1 Intended Use Communication between battery Communication interface packs of single cluster Each AXE 5.0L consists of 100Ah cells which form 51.2V voltage battery module and USB interface USB interface for system upgrade sixteen serial connection (1P16S). A single cluster can connect up to 10 batteries in parallel, and up to 8 clusters in parallel to expand the capacity and power of the energy Link-out for multi-cluster in parallel storage system.
Ÿ Ensure the connection of ground wire reliable. obey the rules at all times when working on or with the PACK. Growatt shall not be liable Ÿ Remove all metal objects such as watches and rings that could cause a short-circuit for any consequence caused by the violation of the following: before installation, replacement and maintenance.
They are no longer suitable for use and may cause danger Nominal Voltage 51.2V Damaged PACKS Nominal Voltage 51.2V to people. If the PACK damaged, stop use it and contact the Growatt Ingress Ingress IP 20 Protection IP 20 Protection or distributor.
3 Storage and Transportation Installation 4 3.1 Storage Requirements Ø Ensure to read the Guidance before installation in order to understand product information and safety cautions/ Assurez-vous de Ø Place the PACK follow the identification on the packing case during storage. lire le guide avant l'installation afin de comprendre les informations Ø...
Page 7
4.2 Basic installation requirements It is recommended to wear the following safety gear when dealing with the PACK. Wall ≥150mm ≥150mm Safety Goggle Safety Shoes Insulated Glove 4.4 Check 4.4.1 Pre-installation Check Check the PACK package before open it. If any abnormity is Check the package Ground Ground...
Page 8
4.5.2 Electrical Connection Installation Method Compound Mode Single cluster installation A*M+B+C Do not forget wear ESD wrist strap and gloves, safety gloves and Ø goggles/ N'oubliez pas de porter un bracelet antistatique et des gants, Floor installation into N columns A*M+B*N+C*N des gants de sécurité...
Page 9
4.5.2.3 Multi-cluster wiring RJ45 dust cover USB dust cover To PCS Battery HUB . . . Cluster 1 Cluster 2 Cluster 3 Cluster 8 Fig 4.9: Block diagram of multi-cluster system To PCS CAN Fig 4.8: Power connection Cluster 1 Cluster 2 Cluster 3 Cluster 8...
Power on and off the Battery 5 4.5.3 Remove the power cord Ø The installation and use of batteries involve much specialized Press knowledge. Therefore, technicians should be given appropriate Upwards technical training and obtain operational certificates in compliance with local laws and regulations. Please ensure technicians have obtained training certificate before operation/ L'installation et l'utilisation des batteries impliquent des connaissances très spécialisées.
Maintenance Guide 6 6.1 Preparation Power on the PACK by PCS Ø Tools like safety gloves, cross head driver and socket wrench should be prepared. Make sure the wiring harnesses are well Connect the battery and PCS Ø Turn off and turn on new PACK. connected 1.
Page 12
Linkin and failure two parallel Linkout; ( ALM Parallel number of Battery systems Light Communication Parallel 1. Check Can connection Battery Model AXE 5.0L-C1/X1 AXE 10.0L-C1/X1 Flickers) failure connection between two batteries, CAN between two Nominal Capacity/Energy 100Ah/5.0kWh 200Ah/10.0kWh failure...
Page 13
Items Specification Items Specification Parallel number of Battery systems Parallel number of Battery systems Battery Model AXE 15.0L-C1/X1 AXE 20.0L-C1/X1 Battery Model AXE 25.0L-C1/X1 AXE 30.0L-C1/X1 Nominal Capacity/Energy 300Ah/15.0kWh 400Ah/20.0kWh Nominal Capacity/Energy 500Ah/25.0kWh 600Ah/30.0kWh Rated Capacity/Energy 270Ah/13.8kWh 360Ah/18.4kWh Rated Capacity/Energy 450Ah/23.0kWh 540Ah/27.6kWh Rated Voltage...
Page 14
Items Specification Items Specification Parallel number of Battery systems Parallel number of Battery systems Battery Model AXE 35.0L-C1/X1 AXE 40.0L-C1/X1 Battery Model AXE 45.0L-C1/X1 AXE 50.0L-C1/X1 Nominal Capacity/Energy 700Ah/35.0kWh 800Ah/40.0kWh Nominal Capacity/Energy 900Ah/45.0kWh 1000Ah/50.0kWh Rated Capacity/Energy 630Ah/32.2kWh 720Ah/36.8kWh Rated Capacity/Energy 810Ah/41.4kWh 900Ah/46.0kWh Rated Voltage...
Page 15
Appendix I LED indication Control Mechanism Over charge and over RUN/ALM light (t=1S) LED light definition discharge flicker green protection SOC indication RUN/ALM Charging Status Items Remark LED1 LED2 LED3 LED4 LED5 current limit RUN/ALM light (t=1S) does not flicker green 0%-25% (t=1S) respond...
Page 16
(SOC is 100%) module voltage Parallel connection over charge RUN/ALM light (t=1S) Shenzhen Growatt New Energy Co., Ltd and over flicker green discharge 4-13/F,Building A,Sino-German(Europe) Industrial Park,Hangcheng Ave, alarm Guxing Community,Xixiang Subdistrict, Bao’an District, Shenzhen, China Discharge RUN/ALM light...
Need help?
Do you have a question about the AXE 5.0L-C1 and is the answer not in the manual?
Questions and answers