5 - Installation
Preliminary checks and usage restrictions
5.1
Before proceeding with the installation, it is necessary to carry out the following preliminary checks:
- The automation installation area must provide the space necessary to carry out maintenance and manual release operations.
- Check that the door is in good mechanical condition, balanced and that it opens and closes correctly.
- Check the overall dimensions by referring to the supplied guide manual.
5.2 Rail Installation
Front
5.3 Belt tensioner
2
3
4
1
1
5
2
3
4
0 mm
5
P.7
Need help?
Do you have a question about the PROBO PR60 R and is the answer not in the manual?