Installation; Selecting A Location - NETGEAR FSM726NA Installation Manual

Managed layer 2 switch with 2 gigabit ethernet ports
Hide thumbs Also See for FSM726NA:
Table of Contents

Advertisement

Managed Layer 2 Switch with 2 Gigabit Ethernet Ports FSM726 Hardware Installation Guide

Installation

Install the equipment in the following sequence, as presented in this chapter:
1. Select a Location. See
2. Install the Switch. See
3. Check the installation. See
4. Apply power, and check the LEDs. See
page
2-5.

Selecting a Location

The switch can be mounted in a standard 19-inch (48.26-centimeter) rack, wall mounted, or left
freestanding (placed on a tabletop). The site where you install the switch can affect its
performance. Before installing the switch or switches, make sure that the chosen installation
location meets the following site requirements.
Table 2-1. Site Requirements for Switch Location
Requirements
Mounting
• Desktop installations. Provide a flat table or shelf surface.
• Rack mounted installations. Use a 19-inch (48.3-centimeter) EIA standard
Put the switch in a position that lets you access the front panel RJ-45 ports, view the
Access
front panel LEDs, and access the rear-panel power connector.
Provide a power source within 6 feet (1.8 meters) of the installation location. Power
specifications for the switch are shown in
Power source
Technical
which can accidentally turn off power to the outlet and the switch.
Environment
Install the switch in a site free from strong electromagnetic field generators (such as
motors), vibration, dust, and direct exposure to sunlight.
Temperature
The ambient switch operating temperature range is 23° to 122°F (–5° to 50°C). Keep
the switch away from heat sources such as direct sunlight, warm-air exhausts, hot-air
vents, and heaters.
Operating humidity
Install the switch in a dry area with a maximum relative humidity of 90%,
noncondensing.
Ventilation
Do not restrict airflow by covering or obstructing air inlets on the sides of the switch.
Keep at least 2 inches (5.08 centimeters) free on all sides for cooling. Be sure that
there is adequate airflow in the room or wiring closet where you will install the switch.
Hardware Installation
"Selecting a
Location.
"Installing the Switch" on page
"Checking the Installation" on page 2-5
"Connecting to Power and Checking the LEDs" on
equipment rack that is grounded and physically secure. Use the rack mounting kit
supplied with your switch.
Specifications. Be sure that the AC outlet is not controlled by a wall switch,
v1.0, July 2009
2-4.
Appendix A, "Factory Default Settings and
2-3

Advertisement

Table of Contents
loading

Table of Contents