Installing the Switch
Installation Procedures
2.
When the switch is powered on, it performs its diagnostic self test. Self test
takes approximately 50 seconds to complete.
LED Behavior
2-10
Check the LEDs on the switch as described below.
Self Test LED
Power and
Fault LEDs
PoE
Test LED
During the self test:
•
Initially, all the switch and port LEDs are on. Most of the LEDs go off
and then may come on again during phases of the self test.
•
For the duration of the self test, the Self Test LED stays on.
Switch port LEDs
Switch 2650-PWR
Switch 2650