Connecting To The Gbic Module Ports - Cisco WS-C3524-PWR-XL-EN Installation Manual

Installation guide
Hide thumbs Also See for WS-C3524-PWR-XL-EN:
Table of Contents

Advertisement

Connecting to the GBIC Module Ports

Step 2
Step 3
Step 4
Connecting to the GBIC Module Ports
Note
Catalyst 3500 Series XL Hardware Installation Guide
2-20
Connect the other end of the cable to an RJ-45 connector of the other device. The
port LED comes on when both the switch and the connected device have
established link.
The port LED is amber while Spanning Tree Protocol (STP) discovers the
topology and searches for loops. This takes about 30 seconds, and then the port
LED turns green.
If the port LED does not come on, the device at the other end might not be turned
on, or there might be a cable problem or a problem with the adapter installed in
the attached device. See
problems.
Reconfigure and reboot the connected device if necessary.
Repeat steps 1 through 3 to connect each device.
Install the Gigabit Interface Converters (GBICs) as described in the
"GBIC Module Slots" section on page
1000BaseX ports.
For detailed instructions on installing, removing, and cabling the GBICs
(1000BaseSX module or the 1000BaseLX/LH module), refer to the GBIC
documentation.
For detailed instructions on installing and cabling the GigaStack GBICs, see the
Catalyst GigaStack Gigabit Interface Converter Hardware Installation Guide.
Chapter 2
Chapter 3, "Troubleshooting,"
1-9, and then connect to the
Installing and Starting Up the Switch
for solutions to cabling
78-6456-04

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents