Powering Up The Router; Verifying A Successful Boot - Cisco 7304 Installation And Configuration Manual

Network service engine
Hide thumbs Also See for 7304:
Table of Contents

Advertisement

Verifying a Successful Boot

Powering Up the Router

To power up a Cisco 7304 router complete the following steps:
Check for the following:
Step 1
Step 2
Plug the AC power supply cable in to the AC power source. Turn the power switch on. Repeat if a second
power supply is installed.
Listen for the fans; you should immediately hear them operating.
Step 3
During the boot process, observe the system LEDs.
Step 4
Note
If the system detects a corrupted FPGA image, you will be prompted to download a golden FPGA image
from ROM 0. The system will then reset automatically and will restart the boot process. The download
is necessary to continue the boot process.
Step 5
Observe the initialization process. When the system boot is complete (a few seconds), the network
services engine begins to initialize the line cards. During this initialization, the LEDs on each line card
behave differently (most flash on and off). The STATUS LED on each line card goes on when
initialization is completed, and the console screen displays a script and system banner similar to the
following:
Cisco Internetwork Operating System Software
IOS (tm) 7300 Software (C7300-JS-M), Version 12.1(9) RELEASED, CISCO
Copyright (c) 1986-2001 by cisco Systems, Inc.
Compiled Fri 20-Apr-01 01:53 by biff
This completes the procedures for connecting input power and powering up the router. This also
completes the procedure for installing the network services engine in a Cisco 7304 router.

Verifying a Successful Boot

The router boots at the point when both the NSE and the power supply are properly installed. If the
following steps occur, you have verified that a successful boot process has occurred.
Cisco 7304 Network Service Engine Installation and Configuration
4-22
Each line card is inserted in its slot, its respective line card levers are in the locked position, and
the locking thumbscrews are tightened.
Empty line card slots have a blank line card installed for cooling and correct airflow.
All network interface cables are connected to the Gigabit Ethernet GBIC module cables.
All network interface cables are connected to the line cards.
A CompactFlash Disk is installed.
Each DC lead is connected and secured to the power supply faceplate with a cable tie.
Each DC lead is connected and secured to the power source (DC-input power supplies only).
Ensure that the tape (that you applied earlier) is removed from the circuit breaker switch handle,
and power is restored by moving the circuit breaker handle to the on (|) position (DC-input
power supplies only).
The console terminal is turned on.
Chapter 4
Removing and Installing the NSE
OL-3967-01

Advertisement

Table of Contents
loading

Table of Contents